Engineer | Form: (06 ) 401162694 1/24/2017 | Prior to initiation of plugging operations, a Bradenhead test shall be performed. If any pressure remains at the conclusion of the test or any liquids were present call COGCC Engineer for sampling requirements. Form 17 shall be submitted within 10 days. |
Engineer | Form: (06 ) 401162694 1/24/2017 | NOTE: Changes in plugging procedure - additional plug(Jsand) and plug depth changed to 5250'
1) Provide 48 hour notice of plugging MIRU via electronic Form 42.
2) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
|