| Engineer | Form: (06) 401266756 05/31/2017 | Prior to initiation of plugging operations, a Bradenhead test shall be performed. If there is 25# or greater present at the beginning of the test call COGCC Engineer for possible sampling requirements. Form 17 shall be submitted within 10 days. |
| Engineer | Form: (06) 401266756 05/31/2017 | NOTE: Changes in plugging procedure - plugs changed to perforate and pump and plug listed as half in-half out surface casing is actually perforated at 500' and 130 sx pumped, this plug needs to be tagged at 170' or shallower.
1) Provide 48 hour notice of plugging MIRU via electronic Form 42.
2) Place plug at 1320', tag plug, must be 1220' or shallower. If surface casing shoe plug not circulated to surface then tag plug – must be 230’ or shallower and provide 10 sx plug at the surface (inside and outside of casing).
3) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
|