| Engineer | Form: (04) 401177825 01/05/2017 | If CBL demonstrates cement coverage from 1130' and a cement top above the Niobrara of shallower than 7260' then no further cementing required, if CBL does not demonstrate required coverages - submit CBL to COGCC for confirmation of remedial cementing. |