| Environmental | Form: (15) 404458505 02/12/2026 | Prior to reclamation of the cuttings trench the Operator shall obtain closure of the remediation project associated with the cuttings trench. |
| Environmental | Form: (15) 404458505 02/12/2026 | The operator will propose the number of discrete samples, the locations, and depth intervals for the confirmation samples. The depth intervals will be selected to provide sufficient coverage between 0 and 19 feet below the final top surface of the cuttings within the trench. Upon approval of the Form 27, TEP will collect the proposed samples and analyze them for the Table 915-1 constituents. |
| Environmental | Form: (15) 404458505 02/12/2026 | If impacts are discovered from the reclaimed reserved pit, operator shall comply with Rule 912.b reporting requirements and remediate all impacts to the current Table 915-1 cleanup concentrations. |