| Environmental | Form: (15) 404302831 02/12/2026 | Per the definition of Cuttings Trench, the depression shall be used specifically for the onsite storage and disposal of dried cuttings generated from drilling a Well. No other E&P Waste or non-E&P waste shall be stored or disposed of in the cuttings trench. |
| Environmental | Form: (15) 404302831 02/12/2026 | The operator will propose the number of discrete samples, the locations, and depth intervals for the confirmation samples. The depth intervals will be selected to provide sufficient coverage between 0 and 19 feet below the final top surface of the cuttings within the trench. Upon approval of the Form 27, TEP will collect the proposed samples and analyze them for the Table 915-1 constituents. |
| Environmental | Form: (15) 404302831 02/12/2026 | Prior to reclamation of the cuttings trench the Operator shall obtain closure of the remediation project associated with the cuttings trench. |