| OGLA | Form: (02A) 401442287 09/25/2018 | Material Handling and Spill Prevention: The following COA will apply:
•All onsite flowlines and pipelines and offsite pipelines will be constructed, maintained, registered, and integrity tested in accordance with the new COGCC 1100 Series Rules (1101, 1102, 1103, and 1104) updated on May 1, 2018.
•Any temporary surface lines used for hydraulic stimulation and/or flowback operations will be pressure tested and will require to be registered if in use for longer than 12 months. |
| OGLA | Form: (02A) 401442287 09/25/2018 | Emissions Mitigation: The following COAs will apply:
•Operator shall comply with COGCC’s current NOTICE TO OPERATORS: Rule 912. VENTING OR FLARING PRODUCED NATURAL GAS – STATEWIDE. |
| OGLA | Form: (02A) 401442287 09/25/2018 | Drilling/Completions: The following COAs will apply:
•All cuttings generated during drilling with oil based mud (OBM) must be kept in tanks or containers or placed on a lined and bermed portion of the well pad prior to disposition.
•The moisture content of all cuttings managed onsite or transported offsite shall be kept as low as practicable to prevent accumulation of liquids greater than de minimis amounts.
•Light sources will be directed downwards and away from occupied structures.
•Flowback and stimulation fluids must be sent to enclosed tanks, separators, or other containment or filtering equipment before the fluids can be placed into any pipeline, storage vessel, or other open top containment located on the well pad or into tanker trucks for offsite disposal.
•No open top tanks can be used for initial flowback fluids containment. |
| OGLA | Form: (02A) 401442287 09/25/2018 | Construction: The following COAs will apply:
•Secondary containment for flowback storage tanks shall meet the requirements of Rule 906.d.(1).
•No construction or routine maintenance activities will be performed during periods when the soil is too wet to adequately support construction equipment.
•Keep well site location, road and pipeline easement free of noxious weeds, litter and debris. |
| OGLA | Form: (02A) 401442287 10/27/2018 | Planning: The following COA will apply:
•Since oil and produced water storage tanks are not planned to be constructed on this well pad location, operator shall submit a scaled as-built drawing (plan view with distances) of this well pad from which the oil and produced water will be sent from via underground pipelines (showing wellheads, onsite flowlines, offsite pipelines, pumping jacks, and any other ancilliary production facilities). The product receiving location, the central tank battery facility location, will also require a scaled as-built drawing (plan view with distances), showing onsite flowlines, offsite and onsite pipelines, truck loadout (if constructed), and production facilities (separators, combustor, etc.) within 60 calendar days of construction of the production equipment on all locations. |
| OGLA | Form: (02A) 401442287 10/27/2018 | Planning: The following COA will apply:
•Provide Notices as described in the most current version of the Northwest Notification Policy. |
| Environmental | Form: (04) 402409065 05/29/2020 | The tank should be stored in a way that it is compliant with all stormwater rules and
permits. |
| Environmental | Form: (04) 402409065 05/29/2020 | The tank should be used only as decribed in this Sundry. |
| Environmental | Form: (04) 402409065 05/29/2020 | All material should be handled as E&P waste. |
| Environmental | Form: (04) 402409065 05/29/2020 | Tank should have secondary containment per rule 604.c.(3)B.
|
| Environmental | Form: (04) 402409065 05/29/2020 | The Tank should be removed no later than 7/18/2020. |
| Environmental | Form: (04) 402409065 06/01/2020 | The Operator shall follow Rules 906.a,b,c, and d. for any Spills/Releases that may occur during these operations. |
| OGLA | Form: (04) 403280117 01/16/2023 | Any potential emissions or releases will need to be controlled. |