LOCATION458787Lussing Trust 4-64 19-20 3AH-3DH,
4AH-4DH Pad
CRESTONE PEAK RESOURCES OPERATING LLC
10633
AC
7/1/2025
 
 
AURORA/ARAPAHOE  005
NWSW 19 4S64W 6
458787View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A )
401602066
9/28/2018
Green Completions -Test separators and associated flow lines, sand traps and emission control systems shall be installed on-site to accommodate green completions techniques. When commercial quantities of salable quality gas are achieved at each well, the gas shall be immediately directed to a sales line or shut in and conserved. If a sales line is unavailable or other conditions prevent placing the gas into a sales line, the operator shall not produce the wells without an approved variance per Rule 805.b.(3)C.
OGLAForm: (02A )
401602066
10/4/2018
Operator shall comply with 1000-Series Rules for Interim Reclamation. All areas not in use for production activities shall be reclaimed in accordance with the 1000-Series Rules within 6 months of the spud date for the approved well. In the event additional operations are to occur within 12 months of the spud date, Operator shall submit a Rig Schedule showing a scheduled timeline of additional drilling operations via Form 4 Sundry. If additional drilling operations have not commenced at 12 months, Operator shall submit a Variance Request via Form 4 Sundry for compliance with additional bonding requirements as identified in the NTO for Interim Reclamation prior to the 12 month deadline.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Drilling/Completion OperationsForm: (02A )
401602066
11/5/2018
Construction Operator will have an MLVT Design Package, certified and sealed by a licensed professional engineer, which is on file in their office and available upon request. The site shall be prepared in accordance with the specifications of the design package prior to tank installation; including ensuring that proper compaction requirements have been met. The MLVT will be at least 75 feet from a wellhead, fired vessel, heater-treater, or a compressor with a rating of 200 horsepower or more. It will be placed at least 50 feet from a separator, well test unit, or other non-fired equipment. All liner seams will be welded and tested in accordance with applicable ASTM international standards. Operator will be present during initial filling of the MLVT and the contractor will supervise and inspect the MLVT for leaks during filling. Operator will comply with the testing and re-inspection requirements and associated written standard operating procedures (SOP) listed on the design package. Signs will be posted on the MLVT indicating that the contents are freshwater. The MLVT will be operated with a minimum of 1 foot of freeboard at all times. Access to the MLVT will be limited to operational personnel and authorized regulatory agency personnel. Operator or contractor will conduct daily visual inspections of the exterior wall and surrounding area for integrity deficiencies. Operator will have a contingency plan/emergency response plan associated with the MLVT and it is on file at their office. A fabric reinforced liner will be utilized. In the event that a tank breach were to occur, the fabric reinforced liner will prevent a “zippering” failure from occurring. The liner will meet the specifications per the design package. Operator acknowledges and will comply with the Colorado Oil & Gas Conservation Commission Policy on the Use of Modular Large Volume Tanks in Colorado dated June 13, 2014.