Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
LOCATION458558Marmot 0880
S19 CTB
FULCRUM ENERGY OPERATING LLC
10805
AC
6/7/2024
 
 
JACKSON  057
SESE 19 8N80W 6
458558View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
401691487
09/24/2018
Underground Injection Well Control: The following COAs will apply: • Approval of this Form 2A does not authorize the right to inject at the Marmot 0880 S19 CBT Pad. Authorization to inject into the selected Formation(s) requires approval of the following COGCC Forms; Form 2 APD, Form 31, Form 33, Form 14A, and Form 26. • Operator will use suitable containment devices for all required chemicals, hazardous materials, and injection equipment (pumps) used onsite during the operation of the injection well. • Operator must equip all produced water storage tanks associated with the injection well with an electronic level monitoring device that automatically shuts in all flow to the injection tanks to prevent overfilling or during an upset condition, such as a leak or a fire. • Operator must construct the secondary containment for the injection well tanks to have a capacity of 150 percent of the largest tank in the containment area. • Operator's pumpers will perform daily inspections to monitor tanks and secondary containment capacity. Operator will temporarily shut in all production wells on the pad in the event of any upset condition. • Unless otherwise determined by COGCC staff (Engineering Group) a water sample of the proposed injection formation(s) will be collected and analyzed for total dissolved solids (TDS), before the start of hydraulic stimulation of the injection well.
OGLAForm: (02A)
401691487
09/24/2018
Material Handling and Spill Prevention: The following COAs will apply: • All onsite flowlines and pipelines and offsite pipelines will be constructed, maintained, registered, and integrity tested in accordance with the COGCC 1100 Series Rules (1101, 1102, 1103, and 1104) updated on May 1, 2018. • Any temporary surface lines used for hydraulic stimulation and/or flowback operations will be pressure tested and will require to be registered if in use for longer than 12 months.
OGLAForm: (02A)
401691487
09/24/2018
Emissions Mitigation: The following COA will apply: • Operator shall comply with COGCC’s current NOTICE TO OPERATORS: Rule 912. VENTING OR FLARING PRODUCED NATURAL GAS – STATEWIDE.
OGLAForm: (02A)
401691487
09/24/2018
Drilling/Completions: The following COAs will apply: • All cuttings generated during drilling with oil based mud (OBM) must be kept in tanks or containers or placed on a lined and bermed portion of the well pad prior to disposition. • The moisture content of all cuttings managed onsite or transported offsite shall be kept as low as practicable to prevent accumulation of liquids greater than de minimis amounts. •Light sources will be directed downwards and away from occupied structures. •Flowback and stimulation fluids must be sent to enclosed tanks, separators, or other containment or filtering equipment before the fluids can be placed into any pipeline, storage vessel, or other open top containment located on the well pad or into tanker trucks for offsite disposal. •No open top tanks can be used for initial flowback fluids containment.
OGLAForm: (02A)
401691487
09/24/2018
Construction: The following COAs will apply: • Secondary containment for flowback storage tanks shall meet the requirements of Rule 906.d.(1). • No construction or routine maintenance activities will be performed during periods when the soil is too wet to adequately support construction equipment. • Keep well site location, road and pipeline easement free of noxious weeds, litter and debris.
OGLAForm: (02A)
401691487
10/27/2018
Planning: The following COA will apply: • Since oil and produced water storage tanks are not planned to be constructed on the nearby well pad location(s), operator shall submit a scaled as-built drawing (plan view with distances) of this central tank battery facility location showing onsite flowlines, offsite and onsite pipelines, truck loadout (if constructed), and production facilities (separators, combustor, etc.) and the nearby well pad location(s) to which the oil and produced water will be sent from via underground pipelines, showing wellheads, onsite flowlines, offsite pipelines, pumping jacks, oil and produced water storage tanks, and other production facilities, within 60 calendar days of construction of the production equipment on all locations.
OGLAForm: (02A)
401691487
10/27/2018
Planning: The following COA will apply: • Provide Notices as described in the most current version of the Northwest Notification Policy.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (02A )
401691487
10/31/2018
Remove only the minimum amount of vegetation necessary for the construction of roads and facilities. Conserve topsoil during excavation and reuse as cover on disturbed areas to facilitate regrowth of vegetation.
General HousekeepingForm: (02A )
401691487
10/31/2018
Spray for noxious weeds and implement dust control, as needed.
Storm Water/Erosion ControlForm: (02A )
401691487
10/31/2018
Implement and maintain BMPs to control stormwater runoff in a manner that minimizes erosion, transport or sediment offsite, and site degradation.