OGLA | Form: (02A ) 401415750 12/8/2017 | Location lies within proximity of a surface water drainage. Operator shall employ tertiary containment along the cross- and down-gradient perimeters of the Location. |
OGLA | Form: (02A ) 401415750 5/15/2018 | Green Completions -Test separators and associated flow lines, sand traps and emission control systems shall be installed on-site to accommodate green completions techniques. When commercial quantities of salable quality gas are achieved at each well, the gas shall be immediately directed to a sales line or shut in and conserved. If a sales line is unavailable or other conditions prevent placing the gas into a sales line, the operator shall not produce the wells without an approved variance per Rule 805.b.(3)C. |