OGLA | Form: (02A ) 401415017 11/13/2017 | Operator shall comply with 1000-Series Rules for Interim Reclamation. All areas not in use for production activities shall be reclaimed in accordance with the 1000-Series Rules within 6 months of the spud date for the approved well. In the event, additional operations are to occur within 12 months of the spud date, Operator shall submit a Rig Schedule showing a scheduled timeline of additional drilling operations via Form 4 Sundry. If additional drilling operations have not commenced at 12 months, Operator shall submit a Variance Request via Form 4 Sundry for compliance with additional bonding requirements as identified in the NTO for Interim Reclamation prior to the 12 month deadline. |
OGLA | Form: (02A ) 401415017 11/13/2017 | Operator shall comply with all requirements as set forth in the COGCC Notice to Operators for Interim Reclamation. |
OGLA | Form: (02A ) 401415017 11/13/2017 | Operator shall employ engineering controls to ensure that the Location does not impede the flow of surface water in the transecting drainage. |
OGLA | Form: (02A ) 401415017 5/15/2018 | Green Completions -Test separators and associated flow lines, sand traps and emission control systems shall be installed on-site to accommodate green completions techniques. When commercial quantities of salable quality gas are achieved at each well, the gas shall be immediately directed to a sales line or shut in and conserved. If a sales line is unavailable or other conditions prevent placing the gas into a sales line, the operator shall not produce the wells without an approved variance per Rule 805.b.(3)C. |