| General Housekeeping | Form: (02A ) 401487889 7/22/2018 | 804. Visual Impacts: All long term facility structures will be painted a color that enables the facilities to blend in with the natural background color of the landscape, as seen from a viewing distance and location typically used by the public
Maintain appearance with garbage clean-up; a trash bin will be located on site to accumulate waste by the personnel drilling the wells. Site will have unused equipment, trash and junk removed immediately.
|
| Storm Water/Erosion Control | Form: (02A ) 401487889 7/22/2018 | Implement and maintain BMPs to control stormwater runoff in a manner that minimizes erosion, transport of sediment offsite, and site degradation. Co-locate flowlines and/or gathering lines whenever feasible, and mitigate any erosion problems that arise due to the construction of any pipeline(s). |
| Dust control | Form: (02A ) 401487889 7/22/2018 | 805.c. Operator shall employ practices for control of fugitive dust caused by their operations. Such practices shall include but are not limited to the use of speed restrictions, regular road maintenance, restriction of construction activity during high- wind days, and silica dust controls when handling sand used in hydraulic fracturing operations. Additional management practices such as road surfacing, wind breaks and barriers may be used. |
| Construction | Form: (02A ) 401487889 7/22/2018 | 803. Permanent lighting will be installed around the facility to allow both the operator and haulers to conduct safe operations at night. All lights will be directed down toward the location or shielded so no light pollution leaves the facility. |
| Odor mitigation | Form: (02A ) 401487889 7/22/2018 | 805. Oil & gas facilities and equipment shall be operated in such a manner that odors do not constitute a nuisance or hazard to public welfare. Operator will utilize advanced oil based mud systems which target the reduction of aromatics. |
| Interim Reclamation | Form: (02A ) 401487889 7/22/2018 | Operator shall be responsible for segregating the topsoil, backfilling, re-compacting, reseeding, and re-contouring the surface of any disturbed area so as not to interfere with Owner’s operations and shall reclaim such area to be returned to pre-existing conditions as best as possible with control of all noxious weeds. |
| | Form: (04 ) 401768083 10/18/2018 | Operator shall comply withe the Colorado Oil and Gas Conservation Cmmission Policy on the Use of Modular Large Volume Tanks in Colorado, dated June 13, 2014. |