| OGLA | Form: (02A) 401437962 01/04/2018 | Operator shall comply with 1000-Series Rules for Interim Reclamation. All areas not in use for production activities shall be reclaimed in accordance with the 1000-Series Rules within 6 months of the spud date for the approved well. In the event, additional operations are to occur within 12 months of the spud date, Operator shall submit a Rig Schedule showing a scheduled timeline of additional drilling operations via Form 4 Sundry. If additional drilling operations have not commenced at 12 months, Operator shall submit a Variance Request via Form 4 Sundry for compliance with additional bonding requirements as identified in the NTO for Interim Reclamation prior to the 12 month deadline. |
| OGLA | Form: (02A) 401437962 01/04/2018 | Operator shall comply with all requirements as set forth in the COGCC Notice to Operators for Interim Reclamation. |
| OGLA | Form: (02A) 401437962 01/05/2018 | Location lies within proximity to a surface water drainage. Operator shall employ tertiary containment along the cross- and down-gradient perimeters of the Location. |