| Traffic control | Form: (02A ) 401600167 5/16/2018 | Renegade will construct all leasehold roads to accommodate local emergency vehicle access requirements and will be maintained in a reasonable condition. A traffic Plan was submitted to Arapahoe County with the submission of the Use by Special Review application. |
| General Housekeeping | Form: (02A ) 401600167 5/16/2018 | Guide Line Anchors: All guide line anchors left buried for future use will be identified by a marker of bright color not less than four feet in height and not greater than one foot east of the guide line anchor. |
| General Housekeeping | Form: (02A ) 401600167 5/16/2018 | Removal of Surface Trash: Renegade agrees that all trash, refuse pipe, equipment, liquids, chemicals or other materials that are not necessary for the continued operations of the well will be removed and disposed of no later than 30 days after completion. No such items will be burned or buried on location. |
| Storm Water/Erosion Control | Form: (02A ) 401600167 5/16/2018 | Renegade will maintain a Stormwater Management Plan with site specific measures to assess erosion control. Renegade will make thorough inspections in accordance with the requirements set forth by CDPHE Water Quality Division (WQD). The inspection schedule is as follows:
While site is under construction, an inspection is required at least every 14 calendar days;
Post storm event inspections must be conducted within 24 hours after the end of any precipitation or snowmelt event that causes surface erosion.
Inspection records will be kept on file for a minimum of three (3) years from expiration or inactivation of permit coverage. These records will be made available to the regulatory agencies upon request. |
| Material Handling and Spill Prevention | Form: (02A ) 401600167 5/16/2018 | To ensure protection of the surface during fracturing treatment, the location will be specifically constructed to contain any releases or spills. Secondary containment from any chemical spills or leaks will surround any trucks that carry, mix, or add chemicals to the flow stream as well as connections that could possibly leak fluid. Should any spill or release occur, every reasonable step will be taken to quickly remediate the area disturbed. |
| Material Handling and Spill Prevention | Form: (02A ) 401600167 5/16/2018 | Renegade and its contractor's employ best management practices during the drilling and production of its wells and facilities. Renegade will comply with appropriate COGCC and any county rules concerning fire and safety. Renegade will ensure that any flammable material will remain no less than 25 feet from the wellhead. |
| Dust control | Form: (02A ) 401600167 5/16/2018 | Dust mitigation measures shall include but are not limited to the use of speed restrictions, regular road maintenance, restrictions of construction activities during high wind days, and silica dust controls when handling sand used in hydraulic fracturing operations. The access road will be constructed with road base aggregate material. Additional management practices such as road surfacing, wind breaks and barriers may be used. |
| Emissions mitigation | Form: (02A ) 401600167 5/16/2018 | Green Completions - When commercial quantities of salable quality gas are achieved at each well, the gas shall be immediately directed to a sales line or shut in and conserved. If a sales line is unavailable or other conditions prevent placing the gas into a sales line, the operator shall not produce the wells without an approved variance per Rule 805.b.(3)C. |
| Odor mitigation | Form: (02A ) 401600167 5/16/2018 | Renegade will comply with Rule 805 and Department of Public Health and Environment, Air Quality Control Commission, Regulation No. 2 Odor Emission, 5 C.C.R. 1001-4, Regulation No. 3 (5 C.C.R. 1001-5), and Regulation No. 7 Section XVII.B.1 (a-c) and Section XII. |
| Drilling/Completion Operations | Form: (02A ) 401600167 5/16/2018 | Green Completions: Test separators and associated flow lines and sand traps shall be installed on-site to accommodate Green completion techniques pursuant to COGCC Rules. Renegade will utilize ECDs with adequate capacity, will be flanged to route gas to other or permanent oxidizing equipment and shall be provided with the equipment needed to maintain combustions where noncombustible gases are present. |
| Interim Reclamation | Form: (02A ) 401600167 5/16/2018 | Rehabilitation of unneeded previously disturbed areas will consist of back sloping and contouring all cut/fill slopes. These areas will be reseeded. The portions of the cleared well site not needed for operational and safety purposes will be recontoured to the original contour if feasible, or if not feasible, to an interim contour that blends with the surrounding topography as much as possible. Sufficient level area will remain for setup of a workover rig and to park equipment. In some cases, rig anchors may need to be pulled and reset after recontouring to allow for maximum interim reclamation. |
| Final Reclamation | Form: (02A ) 401600167 5/16/2018 | Within 90 days subsequent to the time of plugging and abandonment of the entire site, superfluous debris and equipment shall be removed from the site. |