TypeSource DocumentConditions of Approval
OGLAForm: (02A )
401275895
6/22/2017
Operator shall employ tertiary containment along the perimeter of the location to minimize impacts to the existing ditch.
OGLAForm: (02A )
401648068
8/16/2018
Green Completions -Test separators and associated flow lines, sand traps and emission control systems shall be installed on-site to accommodate green completions techniques. When commercial quantities of salable quality gas are achieved at each well, the gas shall be immediately directed to a sales line or shut in and conserved. If a sales line is unavailable or other conditions prevent placing the gas into a sales line, the operator shall not produce the wells without an approved variance per Rule 805.b.(3)C.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Storm Water/Erosion ControlForm: (02A )
401275895
3/28/2018
Confluence will maintain a Stormwater Management Plan with site specific measures to assess erosion control. Confluence will make thorough inspections. The inspection schedule is as follows: While site is under construction, an inspection is required at least every 14 calendar days; Post storm event inspections must be conducted within 24 hours after the end of any precipitation or snowmelt event that causes surface erosion. Inspection records will be kept on file for a minimum of three (3) years from expiration or inactivation of permit coverage. These records will be made available to the regulatory agencies upon request.
Storm Water/Erosion ControlForm: (02A )
401648068
8/16/2018
Confluence will maintain a Stormwater Management Plan with site specific measures to assess erosion control. Confluence will make thorough inspections. The inspection schedule is as follows: While site is under construction, an inspection is required at least every 14 calendar days; Post storm event inspections must be conducted within 24 hours after the end of any precipitation or snowmelt event that causes surface erosion. Inspection records will be kept on file for a minimum of three (3) years from expiration or inactivation of permit coverage. These records will be made available to the regulatory agencies upon request.
Drilling/Completion OperationsForm: (04 )
401767436
9/27/2018
Operator Certifies that the MLVT will be designed and implemented according to the COGCC MLVT Policy dated June 13, 2014 and that there are no building units down gradient from the proposed MLVT.
Drilling/Completion OperationsForm: (04 )
402150078
8/7/2020
Operator certifies that the MLVT will be designed and implemented according to the COGCC MLVT policy dated June 13, 2014 and that there are no building units down gradient from the proposed MLVT.