| OGLA | Form: (02A) 401473064 01/23/2018 | Operator shall comply with 1000-Series Rules for Interim Reclamation. All areas not in use for production activities shall be reclaimed in accordance with the 1000-Series Rules within 6 months of the spud date for the approved well. In the event, additional operations are to occur within 12 months of the spud date, Operator shall submit a Rig Schedule showing a scheduled timeline of additional drilling operations via Form 4 Sundry. If additional drilling operations have not commenced at 12 months, Operator shall submit a Variance Request via Form 4 Sundry for compliance with additional bonding requirements as identified in the NTO for Interim Reclamation prior to the 12 month deadline. |
| OGLA | Form: (02A) 401473064 01/23/2018 | Operator shall employ stormwater controls around the drainage located along the northern portion of the disturbance to prevent migration of stormwater, sediment or other contaminants into the creek to the north of the Location. |
| OGLA | Form: (02A) 401473064 01/23/2018 | Operator shall use best engineering practices to minimize sediment migration into the abutting Surface Water Feature without impedeing the natural drainage flow. |