| Construction | Form: (02A ) 401297061 8/20/2017 | Prior to construction, perimeter controls will be installed utilizing cuttings from the
clearing operations.
Once the well pad has been constructed a variety of BMP's shall be utilized for the site
specific conditions.
BMP's to be utilized may include, but are not limited to:
-Dirt Ditch/Berm
-Erosion Control Blankets
-Straw Bale Barrier
-Straw Wattles
-Seeding
-Imported Hard Armor
-Check Dams
-Culvert/Culvert Protection
-Crimped Straw
-Silt Fence
-Surface Roughening/Surface Rip
During construction, site will be inspected every 14 days and 24-72 hours after any
precipitation event causing erosion depending on the current site activities. These
inspections will be recorded and maintained at Nighthawk's office. Repairs shall be
completed as soon as possible after an inspection reporting BMP repairs are required.
Any site specific modifications will be revised on the site plan when implemented at the
site. A field wide Stormwater Management Plan (SWMP) for the Project Area is
located at Nighthawk's office. Spill Protection Control and Countermeasures (SPCC)
plans for the Project Area are stored on file at Nighthawk's office. The field wide
SWMP addresses SPCC during construction operations.
|
| Construction | Form: (02A ) 401853523 2/12/2019 | Prior to construction, perimeter controls will be installed utilizing cuttings from the clearing operations.
Once the well pad has been constructed, a variety of BMP's shall be utilized for the site-specific conditions.
BMP's to be utilized may include, but not limited to:
-Dirt Ditch/Berm
-Erosion Control Blankets
-Straw Bale Barrier
-Seeding
-Imported Hard Armor
-Check Dams
-Culvert/ Culvert Protection
-Crimped Straw
-Silt Fence
-Surface Roughening/Surface Rip
During Construction, site will be inspected every 14 days and 24-72 hours after any precipitation event causing erosion depending on the current site activities. These inspections will be recorded and maintained at D90's office. Repairs shall be completed as soon as possible after an inspection reporting BMP repairs are required. A site-specific modification will be revised on the site plan when implemented at the site. |