OGLA | Form: (02A ) 401151934 4/18/2017 | Interim Reclamation will be evaluated by well count at the time of completion of the wells currently permitted on this Form 2A. |
OGLA | Form: (02A ) 401365983 9/7/2017 | Operator shall comply with 1000-Series Rules for Interim Reclamation. All areas not in use for production activities shall be reclaimed in accordance with the 1000-Series Rules within 6 months of the spud date for the approved well. In the event, additional operations are to occur within 12 months of the spud date, Operator shall submit a Rig Schedule showing a scheduled timeline of additional drilling operations via Form 4 Sundry. If additional drilling operations have not commenced at 12 months, Operator shall submit a Variance Request via Form 4 Sundry for compliance with additional bonding requirements as identified in the NTO for Interim Reclamation prior to the 12 month deadline.
|
OGLA | Form: (02A ) 401365983 9/7/2017 | Operator shall comply with all requirements as set forth in the COGCC Notice to Operators for Interim Reclamation. |
OGLA | Form: (02A ) 402289761 8/11/2020 | Operator shall submit additional Location Pictures showing greater interior of the Location and individual facilities via Form 4 Sundry, within 45 days upon receipt of this Amended Form 2A. |
OGLA | Form: (04 ) 403134963 8/15/2022 | Operator will implement measures to capture, combust, or control emissions to protect health and safety, and to ensure that vapors and odors from well completion(s), well repair/maintenance, well perforating, temporary abandonment activities, additional equipment installation, and/or testing operations with a workover rig, wireline rig, or other heavy equipment do not constitute a nuisance or hazard to public health, welfare and the environment. Due to proximity of building units (BUs) all blowdown gases will be controlled. |