Storm Water/Erosion Control | Form: (02A ) 401181921 5/14/2017 | 604c.(2).G. Berm Construction: Kerr-McGee will create tertiary containment by construction of a berm or diversion dike, site grading, or other comparable measures sufficient to further protect the water well located 121' north of this proposed oil and gas location. |