COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
401170832
04/12/2017
Interim Reclamation will be evaluated by well count at the time of completion of the wells currently permitted on this Form 2A.
OGLAForm: (02A)
402487940
01/13/2021
Operator will submit a Form 4 Sundry to include Reference Area Pictures consisting of four (4) color photographs of the reference area, taken of vegetation during the growing season, and facing each cardinal direction. Each photograph shall be identified by date taken, Oil and Gas Location name and ID#, and direction of view. These photographs may be submitted at any time up to twelve (12) months after the approval of this Form 2A.
OGLAForm: (04)
403142050
08/26/2022
Operator will implement measures to capture, combust, or control emissions to protect health and safety, and to ensure that vapors and odors from well completion(s), well repair/maintenance, well perforating, temporary abandonment activities, additional equipment installation, and/or testing operations with a workover rig, wireline rig, or other heavy equipment do not constitute a nuisance or hazard to public health, welfare and the environment. Due to proximity of building units (BUs) all blowdown gases will be controlled.
OGLAForm: (04)
403142050
08/26/2022
Prior to commencing operations, at a minimum, the operator will provide an informational sheet to the owners/occupants of BUs that are nearby and adjacent to the parcel (at a minimum of 1000 feet) on which the well is located. The sheet will include the operator's contact information and the nature, timing, and expected duration of the completion(s), well repair/maintenance, well perforating, temporary abandonment activities, additional equipment installation, and/or testing operations with a workover rig, wireline rig, or other heavy equipment.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
General HousekeepingForm: (02A )
402487940
1/14/2021
Flammable liquids shall not be stored within fifty (50) feet of the wellbore, except for the fuel in the tanks of operating equipment or supply for injections pumps. Where terrain and location configuration do not permit maintaining this distance, equivalent safety measures should be taken.
Storm Water/Erosion ControlForm: (02A )
402487940
1/14/2021
Crestone will utilize BMPs at the location to control stormwater runoff in a manner that minimizes erosion, transport of sediment offsite, site degradation, and protects surface waters. The location will also include road base armoring of the location surface, grading, and vehicle tracking on the pad access. Depending on the status of reclamation, the site will be inspected on either a 14-day, 30-day, annual, or rain triggered event.
Material Handling and Spill PreventionForm: (02A )
402487940
1/14/2021
Leak Detection Program * Annual hydrostatic test on the oil dump line from the separator to the tank battery. * Annual hydrostatic "static" tests on our oil tanks. * Annual hydrostatic "static" tests on our produced water tank and water dump line from the separator to the produced water tank. * Lease Operator inspections of all equipment not to exceed 48 hours. * Monthly documented inspections (EU). * Annual environmental inspections of all battery and well equipment and pads. * UT inspections of the pressure vessels every five years and input into Crestone's RIPL Predictive Integrity Maintenance Program. (HLP separators and fuel gas separators) The Crestone lease operator inspections are done as a routine part of the lease operators job. The lease operator would typically visit each of their assigned locations daily. They conduct a visual inspection of the facility which includes all valves, fittings, wellhead, tanks, vapor control systems and all connections. The lease operator also checks our Cygnet automation system for system pressures and flows. Any valve or fitting that is found to be leaking is either repaired immediately by the lease operator or shut-in procedures are implemented. The monthly documented inspection, referenced previously, is done using an electronic form that is recorded in the EU system. This inspection and documentation requires the lease operator to inspect ALL aspects of the site and then triggers work orders for any leaks, or housekeeping issues. The Lease operators also conduct a weekly Audible, Visual, and Olfactory (AVO) inspection, which focuses on the tanks and vapor control system. In addition, the sites are inspected with optical gas imaging cameras on a routine schedule, annually for compliance purposes. Integrity testing of flowlines is done during both the construction phase as well as during the operations phase. At the construction phase lines are tested with 100% xray and go through hydrotests. Pressure testing of the flowlines is conducted on an annual basis.
Material Handling and Spill PreventionForm: (02A )
402487940
1/14/2021
Protection of Shallow Groundwater: Crestone places RPE Liner with 10oz Geomembrane under all mud tanks, as well as the surface and production rig to catch any releases that may occur. In addition, we line our well cellars with a liner material. Conex containment is also used to house items.
Material Handling and Spill PreventionForm: (02A )
402487940
1/14/2021
Well effluent containing more than ten (10) barrels per day of condensate or within two (2) hours after first encountering hydrocarbon gas of salable quality will be directed to a combination of sand traps, separators, surge vessels, and tanks as needed to ensure safe separation of sand, hydrocarbon liquids, water, and gas and to ensure salable products are efficiently recovered for sale or conserved and that non-salable products are disposed of in a safe and environmentally responsible manner.
Material Handling and Spill PreventionForm: (02A )
402487940
1/14/2021
Crestone utilizes 24' tall corrugated galvanized metal berm walls with a capacity in excess of 150% of the largest tank contained within the wall. In addition, Crestone best practices mandates the use of impervious liners that extends under each storage tank and up the walls, permanently affixed to the top of the metal berm wall. Protrusions of piping that come through the liner include a fully sealed "boot" to prevent leakage. Separators will be contained within 22" tall metal berms built on compacted roadbase.
Dust controlForm: (02A )
402487940
1/14/2021
Crestone places road base, rock and recycled asphalt to assist with dust abatement. During construction, drilling, completions and reclamations phases, Crestone monitors each site and, if needed, we will run water trucks on the lease road and county road.
ConstructionForm: (02A )
402487940
1/14/2021
Operator will have an MLVT Design Package, certified and sealed by a licensed professional engineer, which is on file in their office and available upon request. The site shall be prepared in accordance with the specifications of the design package prior to tank installation; including ensuring that proper compaction requirements have been met. The MLVT will be at least 75 feet from a wellhead, fired vessel, heater-treater, or a compressor with a rating of 200 horsepower or more. It will be placed at least 50 feet from a separator, well test unit, or other non-fired equipment. All liner seams will be welded and tested in accordance with applicable ASTM international standards. Operator will be present during initial filling of the MLVT and the contractor will supervise and inspect the MLVT for leaks during filling. Operator will comply with the testing and re-inspection requirements and associated written standard operating procedures (SOP) listed on the design package. Signs will be posted on the MLVT indicating that the contents are freshwater. The MLVT will be operated with a minimum of 1 foot of freeboard at all times. Access to the MLVT will be limited to operational personnel and authorized regulatory agency personnel. Operator or contractor will conduct daily visual inspections of the exterior wall and surrounding area for integrity deficiencies. Operator will have a contingency plan/emergency response plan associated with the MLVT and it is on file at their office. A fabric reinforced liner will be utilized. In the event that a tank breach were to occur, the fabric reinforced liner will prevent a "zippering" failure from occurring. The liner will meet the specifications per the design package. Operator acknowledges and will comply with the Colorado Oil & Gas Conservation Commission Policy on the Use of Modular Large Volume Tanks in Colorado dated June 13, 2014.
Noise mitigationForm: (02A )
402487940
1/14/2021
Crestone will perform a baseline noise survey prior to any operational activity. Crestone will install temporary 32' sound walls on all four sides of the well pad that will go up once the pad has been constructed and stay up during drilling and completions phases to minimize noise and light impacts. Once the wells are on production, if needed as determined by any additional sound monitoring, Crestone will install more permanent noise mitigation at the facility location to meet all COGCC regulations. These are lower profile and removable sound walls, inside the facility, to mitigate any noise from the compression area.
Noise mitigationForm: (02A )
402487940
1/14/2021
Crestone Peak Resources will construct the subject location to allow potential future noise mitigation installation without disturbance.
Odor mitigationForm: (02A )
402487940
1/14/2021
Drilling rig and completion engine exhausts are pointed straight up so as not to be directed towards any occupied buildings. During the fracturing process, diesel-fueled fracturing equipment will be away from the Building Unit. To mitigate the effects of odor from Crestone's operations, Crestone will employ only International Association of Oil & Gas Producers (IOGP) Group III drilling base fluids with <0.5 weight % aromatics and will not use drilling fluids based on diesel. We also employ the use of mud chillers. Sealed tanks with pressure relief valves and emissions controls will be utilized for the production facilities.
Drilling/Completion OperationsForm: (02A )
402487940
1/14/2021
Green Completions -Test separators and associated flow lines, sand traps and emission control systems shall be installed on-site to accommodate green completions techniques. When commercial quantities of salable quality gas are achieved at each well, the gas shall be immediately directed to a sales line or shut in and conserved. If a sales line is unavailable or other conditions prevent placing the gas into a sales line, the operator shall not produce the wells without an approved variance per Rule 805.b. (3)C.
PlanningForm: (04 )
402969483
3/4/2022
Light Mitigation BMPs: During construction, no night work and no permanent lighting will be installed on the Site. Daylight operations only are performed during this phase of operation. Crestone’s development of the Grande 4-65 20-19 -3AH location necessitates work activities to be performed 24 hours a day during drilling and completion phases, requiring the use of temporary and transient lighting to conform with nationally recognized industry and federally mandated safety standards. There will be a 25’ tower and 4 Head Flood Light LED mobile Temporary lighting Towers and all lighting capable of adjustment will be directed inward, downward and shielded to avoid glare on public roads and to prevent light shining beyond the boundary of the Site, while at the same time providing a safe workplace that is free from recognizable hazards and complies with OSHA, ANSI and IESNA standards. There will also be a fabric photometric diffusion membrane tint on all the lights. The lights will be inward, pointing away from residents and none of the lights are directed outward. Temporary sound walls will be used on all 4 sides of the pad (per the approved Form 2A) in order to mitigate light and sound. Once wells are in the production phase, no night work is anticipated, and no permanent lighting will be installed on the site.
Drilling/Completion OperationsForm: (04 )
402969483
3/4/2022
Crestone will not start drilling operations on the Grande South Pad until after April 1st. All drilling and completions operations on the Grande South Pad will be completed prior to December 1st.