LOCATION449920LBR
5-64 15-16 PAD
TRUE OIL LLC
90450
AC
9/29/2023
WILDCAT
99999
ARAPAHOE  005
NESE 15 5S64W 6
449920View Related
 
COGIS - Conditions of Approval Results
No records to display.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (02A )
401129884
4/6/2017
Emergency Response Plan: Operator will provide the County with an Emergency Response Plan (ERP) to address all potential emergencies that may be associated with an oil and gas facility. Operator shall also provide a copy of such plan to all emergency service providers that would respond to such emergencies. A "will-serve" letter must be obtained from the appropriate emergency provider(s). Fencing: A fencing plan will be determined with surface owner input. Visual Impacts: Painting of oil and gas facilities: except for such facilities that must be painted a certain color for safety reasons, operator agrees to paint all new (post-mou) production facilities with uniform, non-contrasting, non-reflective color tones and with colors matched to, but slightly darker than, surrounding landscapes.
Storm Water/Erosion ControlForm: (02A )
401129884
4/6/2017
Stormwater controls will be used to protect the seasonal stream that is within the limits of disturbance.
ConstructionForm: (02A )
401129884
4/6/2017
Operator has an MLVT Design Package, certified and sealed by a licensed professional engineer, which is on file in their office and available upon request. • The MLVT will be at least 75 feet from a wellhead, fired vessel, heater-treater, or a compressor with a rating of 200 horsepower or more. It will be placed at least 50 feet from a separator, well test unit, or other non-fired equipment. • All liner seams will be welded and tested in accordance with applicable ASTM International standards. • Operator will be present during initial filling of the MLVT and the contractor will supervise and inspect the MLVT for leaks during filling. • Operator will comply with the testing and re-inspection requirements and associated written standard operating procedures (SOP) listed on the design package. • Signs will be posted on the MLVT indicating that the contents are freshwater. • The MLVT will be operated with a minimum of 1 foot of freeboard at all times. • Access to the MLVT will be limited to operational personnel and authorized regulatory agency personnel. • Operator or contractor will conduct daily visual inspections of the exterior wall and surrounding area for integrity deficiencies. • Operator has developed a contingency plan/emergency response plan associated with the MLVT and it is on file at their office. • Construction: Operator acknowledges and will comply with the Colorado Oil & Gas Conservation Commission Policy on the Use of Modular Large Volume Tanks in Colorado dated June 13, 2014.
Drilling/Completion OperationsForm: (02A )
401129884
4/6/2017
Green Completions - Emission Control System: Test separators and associated flow lines and sand traps shall be installed on-site to accommodate green completions techniques pursuant to COGCC Rules. In the anticipated absence of a viable gas sales line, the flowback gas shall be thermally oxidized in an emissions control device (ECD), which will be installed and kept in operable condition for least the first 90-days of production pursuant to CDPHE rules. This ECD shall have an adequate capacity for 1.5 times the largest flowback within a 10 mile radius, will be flanged to route gas to other or permanent oxidizing equipment and shall be provided with the equipment needed to maintain combustions where non-combustible gases are present. Test separators and associated flow lines and sand traps shall be installed on-site to accommodate green completions techniques pursuant to COGCC Rules. All salable quality gas shall be directed to the sales line as soon as practicable or shut in and conserved.
Drilling/Completion OperationsForm: (02A )
401129884
4/6/2017
Alternative Logging Program - Multi-Well Pad: One of the first wells drilled on the pad will be logged with open-hole Resistivity Log and Gamma Ray Log from the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open-hole logs shall clearly state “No open-hole logs were run” and shall clearly identify (by API#, well name & number) the well in which open-hole logs were run.
ConstructionForm: (04 )
401612511
7/10/2018
Buried Produced Water Vaults shall be properly designed, constructed, installed, and operated in a manner to contain materials safely. A synthetic or engineered liner shall be placed directly beneath. Such vessels shall be tested for leaks after installation and maintained, repaired, or replaced to prevent spills or releases of E&P waste.
Drilling/Completion OperationsForm: (04 )
401758687
9/28/2018
Operator shall comply with the Colorado Oil and Gas Conservation Commission Policy for the Use of Modular Large Volume Tanks in Colorado, dated June 13, 2014.