Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
LOCATION449179Bear 3-65 22-23
CRESTONE PEAK RESOURCES OPERATING LLC
10633
AC
12/1/2025
WILDCAT
99999
AURORA/ADAMS  001
NWSW 22 3S65W 6
449179View Related
 
COGIS - Conditions of Approval Results
No records to display.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (02A )
401140149
2/9/2017
Stormwater BMP’s will vary according to location and will remain in place until the pad reaches final reclamation. Conoco Phillips will use perimter controls and will be in place prior to site grubbing and clearing.
Community Outreach and NotificationForm: (02A )
402289758
6/3/2020
The City of Aurora Life Safety Division was consulted during the local permit process regarding hydrocarbon storage at the Location.
Storm Water/Erosion ControlForm: (02A )
402289758
6/3/2020
Operator will install stormwater controls around the perimeter of the location prior to construction and will include a ditch and berm system and a stormwater detention pond located in the northeast corner of the Location. They will remain in place through final reclamation or until pad is stabilized.
Material Handling and Spill PreventionForm: (02A )
402289758
6/3/2020
Secondary Containment and Leak Detection All facilities will be equipped with remote monitoring and remote shut down, which includes isolation at the well head. Engineered liner systems will be used in secondary steel containment systems for tank batteries. Pollution control containers (spill boxes) will be used on truck loading lines and placed within the limits of the secondary containment system. Automatic shutdown level devices will be installed on each tank with remote monitoring capabilities. Automatic shutdown level devices will be installed on all pressure vessels and liquid knockouts. Automatic shutdown pressure devices will be installed on flowlines from well heads to facilities with remote monitoring capabilities. Additionally, cathodic protection will be used on buried steel lines to mitigate corrosion. Automatic shutdown pressure devices will be installed on process vessels with remote monitoring capabilities.
Emissions mitigationForm: (02A )
402289758
6/3/2020
Emissions Controls Combustors will be available at the Location during the entire production phase to eliminate fugitive emissions in the event of maintenance or emergency use. The device will be fired using natural gas and operate with a 98% or higher hydrocarbon destruction efficiency. The device will be designed and operated in a manner that will ensure no visible emissions during normal operation. Test separators and associated flow lines, sand traps and emission control systems shall be installed on-site to accommodate green completions techniques. When commercial quantities of salable quality gas are achieved at each well, the gas shall be immediately directed to a sales line or shut in and conserved. If a sales line is unavailable or other conditions prevent placing the gas into a sales line, Operator shall not produce the wells without an approved variance per Rule 805.b.(3)C.