Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
LOCATION448844EWS
4A
EWS 4 DJ BASIN LLC
10649
AC
5/5/2017
WATTENBERG
90750
KEENESBURG/WELD  123
SENW 17 2N63W 6
448844View Related
 
COGIS - Conditions of Approval Results
No records to display.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (02A )
401151285
12/27/2016
The EWS 4A is a single well pad that will be linked to the EWS Facility #4 by a buried 4-inch pipeline.
Traffic controlForm: (02A )
401151285
12/27/2016
Access road. The access road will be constructed to accommodate local emergency vehicles. This road will be maintained for access until drilling and completion operations are complete. Emergency access will be at the EWS Facilty #4 once drilling and completion operations are complete.
General HousekeepingForm: (02A )
401151285
12/27/2016
Fencing requirements. A permanent fencing plan will be created by Expedition during the final construction of the location. Expedition is under contract for the property and will be the surface owner.
General HousekeepingForm: (02A )
401151285
12/27/2016
Removal of surface trash. All trash, debris and material not intrinsic to the operation of the oil and gas facility shall be removed and legally disposed of as is applicable.
Material Handling and Spill PreventionForm: (02A )
401151285
12/27/2016
Leak Detection Plan. Staff will visit the location daily and visually inspect all fittings for leaks. Additionally, monthly documented SPCCP inspections are conducted pursuant to 40 CFR §112. There will be no produced water or hydrocarbon storage tanks at this location.
Material Handling and Spill PreventionForm: (02A )
401151285
12/27/2016
Berm construction. No permanent berms shall be constructed at this site. During drilling operations the well pad will be bermed.
Material Handling and Spill PreventionForm: (02A )
401151285
12/27/2016
Load-lines. All load-lines shall be bull-plugged or capped.
Material Handling and Spill PreventionForm: (02A )
401151285
12/27/2016
Tank specifications No tanks for produced water or hydrocarbons will be constructed on this site.
Noise mitigationForm: (02A )
401151285
12/27/2016
Rig shrouding is not believed necessary as this is a remote area. Permanent equipment on location shall be muffled to reduce noise, or shall be appropriately buffered.
Odor mitigationForm: (02A )
401151285
12/27/2016
Oil & gas facilities and equipment shall be operated in such a manner that odors and dust do not constitute a nuisance or hazard to public welfare.
Drilling/Completion OperationsForm: (02A )
401151285
12/27/2016
Closed Loop Drilling Systems – Pit Restrictions. Not applicable; a closed-loop system will be used for drilling.
Drilling/Completion OperationsForm: (02A )
401151285
12/27/2016
Green Completions – No hydrocarbons are anticipated to be produced from this well. Producing zones will be cased off and cemented.
Drilling/Completion OperationsForm: (02A )
401151285
12/27/2016
Blowout preventer equipment (“BOPE”). A double ram and annular preventer will be used during drilling. At least the drilling company shall have a valid well blowout prevention certifications.
Drilling/Completion OperationsForm: (02A )
401151285
12/27/2016
Pit level indicators. Not applicable; a closed-loop system will be used and no pits shall be dug.
Drilling/Completion OperationsForm: (02A )
401151285
12/27/2016
Drill stem tests. Not applicable; no Drill Stem tests are planned.
Drilling/Completion OperationsForm: (02A )
401151285
12/27/2016
Control of fire hazards. All materials which are considered fire hazards shall be a minimum of 25’ from the wellhead tanks or separators. Electrical equipment shall comply with API RP 500 and will comply with the current national electrical code. An emergency response plan shall be generated for this site.
Drilling/Completion OperationsForm: (02A )
401151285
12/27/2016
Guy line anchors. All guy line anchors shall be brightly marked pursuant to Rule 604.c (2)Q
Drilling/Completion OperationsForm: (02A )
401151285
12/27/2016
Lighting abatement measures shall be implemented, including the installation lighting shield devices on all of the more conspicuous lights and low density sodium lighting where practicable.
Interim ReclamationForm: (02A )
401151285
12/27/2016
BOPE for well servicing operations. Adequate BOP equipment shall be used. Stabbing valves shall be installed in the event of reverse circulation and shall be prior tested with low and high pressure fluid.
Final ReclamationForm: (02A )
401151285
12/27/2016
Within 90-day subsequent to the time of plugging and abandonment of the entire site, superfluous debris and equipment shall be removed from the site.
Final ReclamationForm: (02A )
401151285
12/27/2016
P&A’d wells shall be identified pursuant to 319.a.(5).