LOCATION448269Shook Wellpad
3-1-67
DUNAMIS ENERGY OPERATING LLC
10848
AC
1/3/2023
WATTENBERG
90750
ADAMS  001
NWSE 3 1S67W 6
448269View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
400887627
06/09/2016
Location lies within proximity to a surface water feature. Operator shall use tertiary containment along the cross- and down-gradient perimeters of the Location.
OGLAForm: (02A)
400887627
09/19/2016
Per Operator, there will be no additional tanks other than as described onsite post flowback.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (02A )
400887627
11/4/2016
Development from existing well pads: PetroShare is permitting an Oil and Gas Location Assessment - Form 2A as a multi well pad through the Colorado Oil and Gas Conservation Commission (COGCC). This will eliminate the need for multiple well pads which would ultimately require more surface disturbance.
PlanningForm: (02A )
400887627
11/4/2016
The location was selected due to an existing tree line that will act as a visual barrier.
Traffic controlForm: (02A )
400887627
11/4/2016
Traffic Control: PetroShare will construct or upgrade if necessary all leasehold roads to accommodate local emergency vehicle access requirements and will be maintained in a reasonable condition. PetroShare will provide a Traffic Plan to Adams County per the Administrative Use by Special Review process. The location in concurrence with the surface owner and developer was chosen to utilize the existing access road. Onsite water will be utilized for drilling and completions which will reduce traffic to the location. PetroShare intends to utilize pipelines to transport oil and gas to reduce the amount of traffic.
General HousekeepingForm: (02A )
400887627
11/4/2016
Guy Line Anchors: All guy line anchors left buried for future use will be identified by a marker of bright color not less than four feet in height and not greater than one foot further of the guy line anchor.
General HousekeepingForm: (02A )
400887627
11/4/2016
Removal of Surface Trash: PetroShare agrees that all trash, refuse pipe, equipment, liquids, chemicals of other materials that are not necessary for the continued operations of the wells will be removed and disposed of no later than 30 days after completion. No such items will be burned or buried on location.
WildlifeForm: (02A )
400887627
11/4/2016
Wildlife and Wildlife Habitat: The proposed oil and gas wells are not within a sensitive wildlife habitat. PetroShare, to the extent possible will not cause significant degradation of wildlife.
Storm Water/Erosion ControlForm: (02A )
400887627
11/4/2016
Erosion Control Measures: PetroShare will maintain a Stormwater Management Plan with site specific measurements to assess erosion control. PetroShare will make thorough inspections, in accordance with the requirements set forth by CDPHE Water Quality Division (WQD). The inspection schedule is as follows: While site is under construction, an inspection is required at least every 14 calendar days; Post storm event inspections must be conducted within 24 hours after the end of any precipitation or snowmelt event that causes surface erosion. Inspection records will be kept on file for a minimum of three (3) years from expiration or inactivation of permit coverage. These records will be made available to COGCC.
Material Handling and Spill PreventionForm: (02A )
400887627
11/4/2016
Leak Detection Plan: The Leak Detection Plan has been included as an Attachment "OTHER" (Document #1010069).
Material Handling and Spill PreventionForm: (02A )
400887627
11/4/2016
Control of Fire Hazards: PetroShare and its contractors will employ best management practices during the drilling and production of its wells and facilities. They will comply with appropriate COGCC and any county rules concerning fire and safety. PetroShare will ensure that any material not in use that may constitute a fire hazard will remain no less than 25 feet from the wellhead (s), tanks and separator(s).
Material Handling and Spill PreventionForm: (02A )
400887627
11/4/2016
Berm Construction: A steel containment berm or structure will be erected around the oil and water storage tanks. The steel berm will be inspected at least every 14 calendar days while the site is under construction and within 24 hours of a precipitation event. During production phase One to seven inspections per week will be recorded and kept in the district office and available to regulatory agencies. Records will be kept electronically indefinitely.
Material Handling and Spill PreventionForm: (02A )
400887627
11/4/2016
Tank specifications: Tanks shall be constructed and maintained in accordance with the National Fire Protection Association Code 30 (2008 version). All tanks will be visually inspected once a day. Recorded inspections will be conducted once a month pursuant to 40 CFR §112.
Dust controlForm: (02A )
400887627
11/4/2016
Dust mitigation measures shall include but are not limited to the use of speed restrictions, regular road maintenance, restrictions of construction activities during high wind days, and silica dust controls when handling sand used in hydraulic fracturing operations. The access road will be constructed with road base aggregate material. Additional management practices such as road surfacing, wind breaks and barriers may be used.
ConstructionForm: (02A )
400887627
11/4/2016
Pursuant to Rule 804, the tank battery shall be painted in uniform, non-contrasting, non-reflective color tones with the colors matched to but slightly darker than the surrounding landscape. The location was selected due to an existing tree line that will act as a visual barrier.
ConstructionForm: (02A )
400887627
11/4/2016
Fencing: The wellsite will be fenced for security and in concurrence with surface owner.
Noise mitigationForm: (02A )
400887627
11/4/2016
PetroShare shall use, at a minimum a 32’ sound wall along the south and a partial wall on the west side of the pad site, with an STC-27 rating or higher.
Odor mitigationForm: (02A )
400887627
11/4/2016
Odor Mitigation: PetroShare will comply with Rule 805 and Department of Public Health and Environment, Air Quality Control Commission, Regulation No. 2 Odor Emission, 5 C.C.R. 1001-4, Regulation No. 3 (5 C.C.R. 1001-5), and Regulation No. 7 Section XVII.B.1 (a-c) and Section XII. PetroShare intends to utilize pipelines to transport oil and gas, reducing the amount of onsite tanks to one. PetroShare will also utilize a VOC to reduce odor emissions. The VOC will be placed facing away from the residential buildings to the south of the location.
Drilling/Completion OperationsForm: (02A )
400887627
11/4/2016
Lighting: All permanent lighting will be directed downward and internally. Temporary lighting shall conform to COGCC rules and regulations and not adversely affect adjacent residential properties. The nearest public road is 900’ away. Lighting from the location will not affect visibility on the road. There is a natural tree barrier between the location and the nearest public road to mitigate light pollution.
Drilling/Completion OperationsForm: (02A )
400887627
11/4/2016
Green Completions: Emission Control Systems. Test separators and associated flow lines and sand traps shall be installed on-site to accommodate Green completion techniques pursuant to COGCC Rules. PetroShare intends to utilize pipeline to transport oil and gas out of the facility, reducing the amount on onsite tanks to 1 as a backup to the pipeline. Produced Water will be held in the onsite tanks and hauled offsite by truck. They will utilize a VOC to reduce emissions.
Interim ReclamationForm: (02A )
400887627
11/4/2016
Interim Restoration (Production): The portions of the cleared well site not needed for operational and safety purposes will be recontoured to the original contour if feasible, or if not feasible, to an interim contour that blends with the surrounding topography as much as possible. Sufficient level area will remain for setup of a workover rig and to park equipment. In some cases, rig anchors may need to be pulled and reset after recontouring to allow for maximum interim reclamation.
Final ReclamationForm: (02A )
400887627
11/4/2016
Well site cleared. Within 90 days subsequent to the time of plugging and abandonment of the entire site, superfluous debris and equipment shall be removed from the site.
Final ReclamationForm: (02A )
400887627
11/4/2016
Final stabilization of the well area will mean revegetation of all areas not including the permanently installed well anchor points. All other areas will be revegetated or covered by permanent materials before they are considered finally stabilized and complete.
Final ReclamationForm: (02A )
400887627
11/4/2016
Identification of plugged and abandoned wells. The wellbore shall be identified with a permanent monument as specified in Rule 319.a.(5) and shall also inscribe or imbed the well number and date of plugging upon the permanant monument.