COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EnvironmentalForm: (15)
401074430
09/30/2016
Pit permit approved establishing pit facility ID number for this pit. Per Rule 902.e. pit would require closure 8/18/16. Continued future use of the pit is subject to finalization of compliance agreement, 502.b. variance request, and site-specific financial assurance.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
General HousekeepingForm: (15 )
401074430
9/30/2016
THE LOCATION WILL BE FENCED AND THE FENCED AREA WILL INCLUDE THE FRESH WATER STORAGE PIT THIS IS FOR A FRESHWATER ONLY PIT THAT HAS ALREADY BEEN CONSTRUCTED. THIS IS ACTUALLY A PIT REPORT
General HousekeepingForm: (15 )
401074430
9/30/2016
FRESH WATER STORAGE PIT SHALL CONTAIN FRESH WATER ONLY AND SIGNAGE PROHIBITING THE USE OF THE PIT FOR ANY FLUIDS THAT DO NOT COME FROM MUNICIPAL, IRRIGATION OR SURFACE WATER SOURCE
Material Handling and Spill PreventionForm: (15 )
401074430
9/30/2016
OPERATOR HAS DESIGNED THE WELL PAD WITH INSLOPING AND A STORM WATER CONTROL DITCH TO PREVENT STORM WATER RUN-ON/RUN-OFF AND THE RELEASE OF FLUIDS FROM THE LOCATION. SEE ATTACHED CONSTRUCTION LAYOUT DRAWING.
Drilling/Completion OperationsForm: (15 )
401074430
9/30/2016
OPERATOR SHALL NOT ALLOW ANY FLUIDS TO FLOW BACK TO THE FRESH WATER STORAGE PIT
Drilling/Completion OperationsForm: (15 )
401074430
9/30/2016
FRESH WATER FOR THE FRESH WATER STORAGE PIT COMES FROM WATER PROVIDER; WATER SOURCES PERMITTED FOR CONSUMABLE INDUSTRIAL USE.
Drilling/Completion OperationsForm: (15 )
401074430
9/30/2016
OPERATOR WILL ENSURE 110% SECONDARY CONTAINMENT FOR ANY VOLUME OF FLUIDS CONTAINED AT THE WELL SITE DURING DRILLING AND COMPLETION. OPERATOR WILL IMPLEMENT BEST MANAGEMENT PRACTICES TO CONTAIN UNINTENTIONAL RELEASE OF FLUIDS.