| Planning | Form: (02A ) 401049695 7/28/2016 | Visual mitigation is not currently planned, however if necessary, Noble will re-evaluate. |
| Traffic control | Form: (02A ) 401049695 7/28/2016 | Traffic control plan will not be created, based on the limited scope of work. |
| General Housekeeping | Form: (02A ) 401049695 7/28/2016 | All surface trash, debris, scrap or discarded material connected with the operations of the property shall be removed from the premises or disposed of in a legal manner. |
| General Housekeeping | Form: (02A ) 401049695 7/28/2016 | Housekeeping will consist of neat and orderly storage of materials and fluids. Wastes will be temporarily stored in sealed containers and regularly collected and disposed of at offsite, suitable facilities. If spills occur prompt cleanup is required to minimize any commingling of waste materials with stormwater runoff. Routine maintenance will be limited to fueling and lubrication of equipment. Drip pans will be used during routine fueling and maintenance to contain spills or leaks. Any waste product from maintenance will be containerized and transported offsite for disposal or recycling. There will be no major equipment overhauls conducted onsite. Equipment will be transported offsite for major overhauls. Cleanup of trash and discarded materials will be conducted at the end of each work day. Cleanup will consist of patrolling the roadway, access areas, and other work areas to pickup trash, scrap debris, other discarded materials, and any contaminated soil. These materials will be disposed of properly. |
| Storm Water/Erosion Control | Form: (02A ) 401049695 7/28/2016 | Stormwater management plans (SWMP) are in place to address construction, drilling and operations associated with Oil & Gas development throughout the state of Colorado in accordance with Colorado Department of Public Health and Environment (CDPHE) General Permit No. COR- 038637. BMP's will be constructed around the perimeter of the site prior to, or at the beginning of construction. BMP's used will vary according to the location, and will remain in place and maintained until the pad reaches final reclamation. |
| Storm Water/Erosion Control | Form: (02A ) 401049695 7/28/2016 | The compressor will be anchored to comply with 603.g and location currently has Floodplain BMP’s installed on existing equipment. |
| Material Handling and Spill Prevention | Form: (02A ) 401049695 7/28/2016 | Noble Energy Inc. designs facilities to avoid releases and to be compliant with all regulations specific to leak detection and control (i.e. SPCC 40CFR112). Inspections are performed at the Facility to confirm operational integrity and regulatory compliance. Noble will perform maintenance if it is deemed necessary through any of the scheduled inspections. |
| Material Handling and Spill Prevention | Form: (02A ) 401049695 7/28/2016 | Any material not in use that might constitute a fire hazard shall be removed a minimum of twenty-five (25) feet from the wellhead, tanks and separator. Any electrical equipment installations inside the bermed area shall comply with API RP 500 classifications and comply with the current national electrical code as adopted by the State of Colorado. |
| Material Handling and Spill Prevention | Form: (02A ) 401049695 7/28/2016 | Spill Prevention Control and Countermeasures (SPCC) plans are in place to address any possible spill associated with Oil & Gas operations throughout the state of Colorado in accordance with CFR 112. |
| Construction | Form: (02A ) 401049695 7/28/2016 | Berms or other secondary containment devices shall be sufficiently impervious to contain any spilled or released material. All berms and containment devices shall be inspected at regular intervals and maintained in good condition. No potential ignition sources shall be installed inside the secondary containment area unless the containment area encloses a fired vessel. Refer to American Petroleum Institute Recommended Practices, API RP - D16. |
| Construction | Form: (02A ) 401049695 7/28/2016 | The existing fence running north to south of the Facility will not be affected by construction activities. |
| Construction | Form: (02A ) 401049695 7/28/2016 | The Facility disturbance area footprint will be increased by approximately 0.3 acre, south of location. An above ground line will be added to location, running from tanks to the VOC burners. A separator will be removed and two VOC burners will be replaced. The new Facility disturbance area will accommodate a turn-around area for routine truck traffic, associated with operations.
The Facility is located within the 100-Year FEMA Floodplain and requires floodplain mitigation. Tanks and separators will be tied-down and tanks will have flood barriers installed up-gradient (Jersey-barriers, structural fencing, concrete). The Facility will be listed with Noble Energy, Inc. floodplain inventory. |
| Construction | Form: (02A ) 401049695 7/28/2016 | At the time of construction, leasehold roads entering location from the north shall be constructed to accommodate local emergency vehicle access requirements, and shall be maintained in a reasonable condition. |
| Noise mitigation | Form: (02A ) 401049695 7/28/2016 | Permanent facility – Sound walls may be installed around any permanent equipment if deemed necessary. |