| OGLA | Form: (02A) 401067210 07/18/2016 | Operator must implement site-specific best management practices in accordance with good engineering practices, including, but not limited to, construction of a berm or diversion dike, site grading, or other comparable measures, sufficient to protect the intermittent creek located 320 feet west of the oil and gas location from a release of drilling, completion, produced fluids, and chemical products. |
| OGLA | Form: (02A) 401067210 07/18/2016 | Operator shall manage noxious weeds in accordance with a weed management plan, if required by the Colorado Noxious Weed Act, to prevent the spread of noxious weeds and to eradicate or control, as necessary, existing noxious weeds. |