| Planning | Form: (02A ) 401040031 7/7/2016 | This proposed oil and gas location is located in a rural rangeland area. The nearest building unit is located 1988’ away. |
| Storm Water/Erosion Control | Form: (02A ) 401040031 7/7/2016 | 604c.(2).G. Berm Construction: Kerr-McGee will create tertiary containment by
construction of a berm or diversion dike, site grading, or other comparable measures
sufficient to further protect the Ditch: 71' E Elev: 5022' of this proposed oil and gas location. |