LOCATION446290Morgan Hills
7H-A168
CRESTONE PEAK RESOURCES OPERATING LLC
10633
AC
1/1/2024
WATTENBERG
90750
ERIE/WELD  123
NENE 7 1N68W 6
446290View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A )
400651431
5/18/2016
Central Hub - Operator will not install hydrocarbon storage tanks on this location. However, Operator may still install all other equipment and facilities necessary for the production of hydrocarbons, including wellhead equipment, separation equipment, electrical equipment, and temporary flowback equipment (including temporary storage tanks). The Operator is required to confer with the Town of Erie and then to submit an amended Form 2A prior to deviating from the foregoing requirement.
OGLAForm: (02A )
400651431
5/18/2016
Well leak detection and repair - Operator will perform audio, visual, and olfactory inspections for leaks from wells and related production facilities on a monthly basis on all at this location once production starts. Operator will also inspect each well with an infra-red camera on a monthly basis when production starts. If the operator determines that repairs are required based on the inspections, Operator will promptly initiate these repairs. After a well has produced for twelve (12) months, the frequency of such inspections shall decrease from monthly to quarterly. Operator will retain documentation of such inspections for at least three (3) years and will provide inspection reports to the COGCC upon request. Operator will also report to the Town of Erie on the inspection results and any associated repairs the month after the inspection or repair occurs. This COA will terminate on September 1, 2020.
OGLAForm: (02A )
400651431
5/18/2016
Contact Information - Operator shall include its contact information, including both a telephone number for the Operator and the address and hours of the Operator’s Erie community office on all required location signage during drilling and completion operations, but not during production operations.
OGLAForm: (02A )
400651431
5/18/2016
Traffic – Operator shall coordinate a traffic plan with the Town of Erie prior to commencement of move in and rig up.
OGLAForm: (02A )
400651431
5/18/2016
Noise mitigation – For db (A) scale noise, operations at this Oil and Gas Location shall be further limited as follows: •Operations normally subject to the light industrial standards shall not exceed 60 db(A). •Operations normally subject to the industrial standards shall be reduced at least five (5) db(A) below the maximum level permitted by those Regulations. •Measurements taken when traffic is passing by the sound level meter will be discounted from the average.
OGLAForm: (02A )
400651431
5/18/2016
Access Roads – Operator shall pave the first 100 feet of the lease road and improve as a crushed surface for the next 100 feet of the lease access road where it exits public right of way, except that this shall not be required over the written objection of a non-operator surface owner.
OGLAForm: (02A )
400651431
5/18/2016
Hydraulic Fracturing Responsible Products Program – Operator’s hydraulic fracturing fluid shall not contain diesel fuels (as defined by EPA 816-R-12-004), 2-butoxyethanol (2-BE), benzene or heavy metals (i.e. lead, mercury, arsenic, cadmium, and chromium).
OGLAForm: (02A )
400651431
5/18/2016
Closed-loop systems – Operator shall use closed-loop systems (no pits) for drilling and completion operation.
OGLAForm: (02A )
400651431
6/2/2016
Any changes to the COAs or BMPs shall be submitted for prior COGCC approval via a Form 4 Sundry Notice. Any changes to BMPs which implicate the Operator’s MOU with Erie shall be submitted with concurrence from the Town of Erie for the change.
OGLAForm: (02A )
400651431
6/2/2016
The Form 2A shall be posted on the location during construction, drilling, and completion operations.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (02A )
400651431
6/22/2016
Where technologically feasible and economically practicable, Encana shall consolidate wells to create multi-well pads, including shared locations with other operators. Multi-well production facilities shall be located as far as possible from Building Units.
Community Outreach and NotificationForm: (02A )
400651431
6/22/2016
Prior to any new operations, provide notification to landowners within 1/2 mile.
Community Outreach and NotificationForm: (02A )
400651431
6/22/2016
Prior to any new operations, provide designated staff member of the Town of Erie the following: A site plan for site preparation, mobilization, and demobilization; A plan for interim reclamation and re-vegetation and final reclamation of the site; A plan for noise, light, and dust mitigation, to the extent feasible and where applicable; A traffic management plan; Update of this information if any plans change during operations.
General HousekeepingForm: (02A )
400651431
6/22/2016
604.c.(2)N. Any material not in use that might constitute a fire hazard will be removed a minimum of twenty-five (25) feet from the wellhead, tanks and separator. Any electrical equipment installations inside the bermed area will comply with API RP 500 classifications and comply with the current national electrical code as adopted by the State of Colorado.
General HousekeepingForm: (02A )
400651431
6/22/2016
604.c.(2)P. All surface trash, debris, scrap or discarded material connected with the operations of the property shall be removed from the premises or disposed of in a legal manner.
General HousekeepingForm: (02A )
400651431
6/22/2016
604.c.(2)T. The well site will be cleared of all non-essential equipment, trash and debris after ninety days of a well P&A.
General HousekeepingForm: (02A )
400651431
6/22/2016
604.c.(2)U. & 319.a.(5) Encana will identify plugged and abandoned wellbores according to Rule 319.a.(5). including the location of the wellbore with a permanent monument as specified in Rule 319.a.(5). Encana will also inscribe or imbed the well number and date of plugging upon the permanent monument.
Material Handling and Spill PreventionForm: (02A )
400651431
6/22/2016
805.b.(3)B.iii. Well effluent containing more than ten (10) barrels per day of condensate or within two (2) hours after first encountering hydrocarbon gas of salable quality will be directed to a combination of sand traps, separators, surge vessels, and tanks as needed to ensure safe separation of sand, hydrocarbon liquids, water, and gas and to ensure salable products are efficiently recovered for sale or conserved and that non-salable products are disposed of in a safe and environmentally responsible manner.
Material Handling and Spill PreventionForm: (02A )
400651431
6/22/2016
Utilize steel-rim berms around tanks and separators instead of sand or soil.
Dust controlForm: (02A )
400651431
6/22/2016
Per Rule 805.c. Encana shall employ practices for control of fugitive dust caused by their operations. Such practices shall include but are not limited to the use of speed restrictions, regular road maintenance, restriction of construction activity during high- wind days, and silica dust controls when handling sand used in hydraulic fracturing operations. Additional management practices such as road surfacing, wind breaks and barriers, or automation of wells to reduce truck traffic may also be required if technologically feasible and economically reasonable to minimize fugitive dust emissions
ConstructionForm: (02A )
400651431
6/22/2016
604.c.(2)O. All loadlines will be capped for every location in the DJ.
ConstructionForm: (02A )
400651431
6/22/2016
604.c.(2)E.ii. The pad will be constructed in such a manner that noise mitigation may be installed and removed without disturbing the site or landscaping.
ConstructionForm: (02A )
400651431
6/22/2016
604.c.(2)E.iii. Subject pad will have all weather access roads to allow for operator and emergency response.
ConstructionForm: (02A )
400651431
6/22/2016
604.c.(2)G. Encana utilizes 24” tall corrugated galvanized metal berm walls with a capacity in excess of 150% of the largest tank contained within the wall. In addition, Encana best practices mandates the use of impervious liners that extends under each storage tank and up the walls, permanently affixed to the top of the metal berm wall. Protrusions of piping that come through the liner include a fully sealed “boot” to prevent leakage.
ConstructionForm: (02A )
400651431
6/22/2016
604.c.(2)M. Encana will install fencing to restrict access to wellheads and equipment.
ConstructionForm: (02A )
400651431
6/22/2016
604.c.(2)S. At the time of construction, all leasehold roads will be constructed to accommodate local emergency vehicle access requirements, and will be maintained in a reasonable condition.
ConstructionForm: (02A )
400651431
6/22/2016
Maximize equipment and wellhead setbacks from occupied buildings and residences.
ConstructionForm: (02A )
400651431
6/22/2016
Per Rule 803, to the extent practicable, Encana shall direct site lighting downward and inward, and lighting shall be shielded so as to avoid glare on public roads and Building Units within one thousand (1000) feet.
Noise mitigationForm: (02A )
400651431
6/22/2016
604.c.(2)A., 802.c, 802.d Encana will perform a baseline noise survey prior to any operational activity measuring dBA at a distance 350 feet from the noise source (unless there is an occupied structure closer than that – then measurement will be taken 25 feet from the structure). If low frequency noise is a concern, measurement of dBC will be taken 25 feet from the occupied structure towards the noise source. As necessary, based on the survey, Encana will install temporary sound walls to minimize noise and light impacts during drilling and completions and will install permanent noise mitigation at the facility location as necessary to meet all COGCC regulations.
Emissions mitigationForm: (02A )
400651431
6/22/2016
604.c.(2)C.i. Flow lines, separators, and sand traps capable of supporting green completions as described in Rule 805 will be installed on subject location at which commercial quantities of gas are reasonably expected to be produced based on existing adjacent wells within 1 mile.
Emissions mitigationForm: (02A )
400651431
6/22/2016
604.c.(2)C.iii. Temporary flowback flaring and oxidizing equipment will include: adequeately sized equipment to handle 1.5 times the largest flowback volume of gas experienced in a ten mile radius. If there is overrun, Encana will shut in the well versus freely venting.
Emissions mitigationForm: (02A )
400651431
6/22/2016
604.c.(2)F. Encana will follow and comply with all leak detection and repair  and storage tank emission management plan conditions as required by Colorado Air Quality Control Commission Regulation Number 7.  This will include at least monthly Audible, Visual and Olfactory (AVO) inspections of the components and tanks at our Production Facilities at most weekly or at least monthly starting on January 1, 2015.  In addition, Encana will perform infra-red camera inspections of these components and the storage tanks at most monthly or at least annually.
Emissions mitigationForm: (02A )
400651431
6/22/2016
All operations will be conducted to meet the provisions of Rule 604.c(2). Proper equipment will be used to prevent venting, and when necessary the proper equipment will be used to combust gases.
Drilling/Completion OperationsForm: (02A )
400651431
6/22/2016
604.c.(2)B.i.Encana will utilize a closed-loop system for drilling operations at this location.
Drilling/Completion OperationsForm: (02A )
400651431
6/22/2016
604.c.(2)B.ii.-v. Encana will not utilize pits.
12