| Reclamation Specialist | Form: (04) 402735613 07/01/2021 | Approval/Passing of the form 4 is not an endorsement of the reclamation plan that has been attached/included with this sundry; Location will need to meet 1000 series reclamation requirements in order to pass final reclamation. A field inspection will be conducted at a future date to evaluate compliance with reclamation standards.
|
| Reclamation Specialist | Form: (04) 402735613 07/01/2021 | Areas detailed in the attached map may or may not encompass the exact areas needed for production operations or the required interim reclamation areas. Future assessments regarding the size and extent of the areas needed for production and interim reclamation will be determined on the ground by reclamation staff during a field inspection. |
| Reclamation Specialist | Form: (04) 402735613 07/01/2021 | If it is determined that a specific BMP is insufficient to mitigate degradation on a site, cannot be implemented per installation specification, or maintained in effective operating condition, then alternative BMPs that are better suited to meet the site’s conditions should be considered and immediately applied, or used in conjunction. |