Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
CENTRALIZED EP WASTE MGMT FAC442514O-29 CENTRALIZED E&P WASTE MANG FAC
QB ENERGY OPERATING LLC
10844
AC
1/29/2018
GRAND VALLEY
31290
GARFIELD  045
SWSE 29 5S96W 6
335836View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EnvironmentalForm: (04)
401633061
05/21/2018
PRODUCED WATER OR FLOWBACK WATER OR OTHER EXPLORATION AND PRODUCTION WASTE SHALL NOT BE TEMPORARILY STORED IN MODULAR LARGE VOLUME STORAGE TANKS (MLVSTs). PRODUCED WATER OR FLOWBACK WATER SHALL BE TEMPORAILY STORED IN FRAC TANKS.
EnvironmentalForm: (04)
401633061
05/21/2018
PROVIDE PRECAUTIONS/SECONDARY CONTAINMENT THAT WILL BE INPLACE FOR BOTH BELOW GRADE AND ABOVE GRADE PIPELINES AS THEY CROSS STREAMS, SENSITVE AREAS, OR ALONG SENSITIVE AREAS.
EnvironmentalForm: (04)
401633061
05/21/2018
BERRY AND CAERUS WILL EACH SEPERATELY SUBMIT AN ANNUAL REPORT TO THE COGCC SUMMARIXZING THE TRANSFER OF PRODUCTION WATER (BOTH AS TRANSFER AND RECEIVING OPERATOR) DURING THE CALENDAR YEAR AND INCUDING LABORATORY ANALYTICAL RESULTS FOR REPRESENTATIVE SAMPLES(S) OF THE PRODUCTION WATER PROVIDED AS THE TRANSFER/RECIEVER. THE ANNUAL REPORT SHALL BE SUBMITTED ON OR BEFORE THE ANNIVERSAY OF THE FIRST DATE OF TRANSFER.
EnvironmentalForm: (04)
401633061
05/21/2018
TERMINATION OF ACITIVITES: BOTH BERRY AND CAERUS SHALL NOTIFY THE COGCC VIA SUNDRY IMMEDIATELY UPON TERMINATION OF ACTIVITIES.
EnvironmentalForm: (04)
401633061
05/21/2018
OPERATOR PROPOSES THAT THIS FACILITY WILL BE IN OPERATION FOR A PERIOD OF 30 DAYS. THIS TRANSFER CAN BE EXTENDED VIA SUNDRY REQUEST, HOWEVER, SHOULD THE OPERATION OF THIS FACILITY CONTINUE MORE THAN ONE YEAR, A FORM 28 SHALL BE SUBMITTED AND APPROVED BEFORE THE ONE-YEAR ANNIVERSARY DATE OF THE FIRST USE OF THE TRANSFER FACIITY/LOCATION.
EnvironmentalForm: (04)
401633061
05/21/2018
OPERATOR MUST IMPLEMENT BEST MANAGEMENT PRACTICES TO CONTAIN ANY UNINTENTIONAL RELEASE OF FLUIDS, INCLUDING ANY FLUIDS CONVEYED VIA TEMPORARY SURFACE PIPELINES.
EnvironmentalForm: (04)
401633061
05/21/2018
IF LOCATIONS ARE IN A SENSITIVE AREA BECAUSE OF ITS PROXIMITY TO SURFACE WATER OPERATOR MUST ENSURE 110 PERCENT SECONDARY CONTAINMENT FOR ANY VOLUME OF FLUIDS CONTAINED AT THE WATER HANDLING FACILITY SITE DURING NATURAL GAS DEVELOPMENT ACTIVITIES AND OPERATIONS; INCLUDING, BUT NOT LIMITED TO, CONSTRUCTION OF A BERM OR DIVERSION DIKE, DIVERSION/COLLECTION TRENCHES WITHIN AND/OR OUTSIDE OF BERMS/DIKES, SITE GRADING, OR OTHER COMPARABLE MEASURES (I.E., BEST MANAGEMENT PRACTICES (BMPS) ASSOCIATED WITH STORMWATER MANAGEMENT) SUFFICIENTLY PROTECTIVE OF NEARBY SURFACE WATER. ANY BERM CONSTRUCTED AT THE WELL PAD LOCATION WILL BE STABILIZED, INSPECTED AT REGULAR INTERVALS (AT LEAST EVERY 14 DAYS), AND MAINTAINED IN GOOD CONDITION.
EnvironmentalForm: (04)
401633061
05/21/2018
IT STATED THAT "Water Origination: Berry produced water will be sourced from the O-29 Centralized E&P Waste Management Facility (Facility ID 442514) in Sec. 29, T5S R96W, Garfield County, Colorado." INSPECTION NUMBER 690900021 SHOWS THE O-29 FACILITY UNDERGOING MODIFICATIONS. WITHIN 2-WEEKS OF APPROVAL OF THIS SUNDRY, PROVIDE THE SOURCE WELLS AND ALL LOCATIONS THAT WILL BE USED IN THIS WATER SHARE. WITHIN 2-WEEKS OF APPROVAL OF THIS SUNDRY, PROVIDE HAUL ROUTES OF ALL LOCATIONS THAT WILL BE USED IN THIS WATER SHARE.
EnvironmentalForm: (04)
401662856
06/12/2018
IF LOCATIONS ARE IN A SENSITIVE AREA BECAUSE OF ITS PROXIMITY TO SURFACE WATER OPERATOR MUST ENSURE 110 PERCENT SECONDARY CONTAINMENT FOR ANY VOLUME OF FLUIDS CONTAINED AT THE WATER HANDLING FACILITY SITE DURING NATURAL GAS DEVELOPMENT ACTIVITIES AND OPERATIONS; INCLUDING, BUT NOT LIMITED TO, CONSTRUCTION OF A BERM OR DIVERSION DIKE, DIVERSION/COLLECTION TRENCHES WITHIN AND/OR OUTSIDE OF BERMS/DIKES, SITE GRADING, OR OTHER COMPARABLE MEASURES (I.E., BEST MANAGEMENT PRACTICES (BMPS) ASSOCIATED WITH STORMWATER MANAGEMENT) SUFFICIENTLY PROTECTIVE OF NEARBY SURFACE WATER. ANY BERM CONSTRUCTED AT THE WELL PAD LOCATION WILL BE STABILIZED, INSPECTED AT REGULAR INTERVALS (AT LEAST EVERY 14 DAYS), AND MAINTAINED IN GOOD CONDITION.
EnvironmentalForm: (04)
401662856
06/12/2018
OPERATOR MUST IMPLEMENT BEST MANAGEMENT PRACTICES TO CONTAIN ANY UNINTENTIONAL RELEASE OF FLUIDS, INCLUDING ANY FLUIDS CONVEYED VIA TEMPORARY SURFACE PIPELINES.
EnvironmentalForm: (04)
401662856
06/12/2018
TERMINATION OF ACITIVITES: BOTH BERRY AND CAERUS SHALL NOTIFY THE COGCC VIA SUNDRY IMMEDIATELY UPON TERMINATION OF ACTIVITIES.
EnvironmentalForm: (04)
401662856
06/12/2018
BERRY AND CAERUS WILL EACH SEPERATELY SUBMIT AN ANNUAL REPORT O THE COGCC SUMMARIXZING THE TRANSFER OF PRODUCTION WATER (BOTH AS TRANSFER AND RECEIVING OPERATOR) DURING THE CALENDAR YEAR AND INCUDING LABORATORY ANALYTICAL RESULTS FOR REPRESENTATIVE SAMPLES(S) OF THE PRODUCTION WATER PROVIDED AS THE TRANSFER/RECIEVER. THE ANNUAL REPORT SHALL BE SUBMITTED ON OR BEFORE THE ANNIVERSAY OF THE FIRST DATE OF TRANSFER AND CAN BE PART OF THE ANNUAL REPROT TO FACILITY TO442514.
EnvironmentalForm: (04)
401662856
06/12/2018
PROVIDE PRECAUTIONS/SECONDARY CONTAINMENT THAT WILL BE INPLACE FOR BOTH BELOW GRADE AND ABOVE GRADE PIPELINES AS THEY CROSS STREAMS, SENSITVE AREAS, OR ALONG SENSITIVE AREAS.
EnvironmentalForm: (04)
401662856
06/12/2018
Within 90 days of this Water Share approval, provide as constructed engineered drawings of the upgraded Pit Facility and Location, stamped by a Colorado P.E.
EnvironmentalForm: (04)
401742706
11/19/2018
Approval of this Sundry does not grant approval for the the fire lane variance.
EnvironmentalForm: (04)
402046693
05/21/2019
PROVIDE PRECAUTIONS/SECONDARY CONTAINMENT THAT WILL BE INPLACE FOR BOTH BELOW GRADE AND ABOVE GRADE PIPELINES AS THEY CROSS STREAMS, SENSITVE AREAS, OR ALONG SENSITIVE AREAS.
EnvironmentalForm: (04)
402046693
05/21/2019
BERRY AND CAERUS WILL EACH SEPERATELY SUBMIT AN ANNUAL REPORT O THE COGCC SUMMARIXZING THE TRANSFER OF PRODUCTION WATER (BOTH AS TRANSFER AND RECEIVING OPERATOR) DURING THE CALENDAR YEAR AND INCUDING LABORATORY ANALYTICAL RESULTS FOR REPRESENTATIVE SAMPLES(S) OF THE PRODUCTION WATER PROVIDED AS THE TRANSFER/RECIEVER. THE ANNUAL REPORT SHALL BE SUBMITTED ON OR BEFORE THE ANNIVERSAY OF THE FIRST DATE OF TRANSFER AND CAN BE PART OF THE ANNUAL REPORT TO FACILITY TO 442514.
EnvironmentalForm: (04)
402046693
05/21/2019
TERMINATION OF ACITIVITES: BOTH BERRY AND CAERUS SHALL NOTIFY THE COGCC VIA SUNDRY IMMEDIATELY UPON TERMINATION OF ACTIVITIES.
EnvironmentalForm: (04)
402046693
05/21/2019
OPERATOR MUST IMPLEMENT BEST MANAGEMENT PRACTICES TO CONTAIN ANY UNINTENTIONAL RELEASE OF FLUIDS, INCLUDING ANY FLUIDS CONVEYED VIA TEMPORARY SURFACE PIPELINES.
EnvironmentalForm: (04)
402046693
05/21/2019
IF LOCATIONS ARE IN A SENSITIVE AREA BECAUSE OF ITS PROXIMITY TO SURFACE WATER OPERATOR MUST ENSURE 110 PERCENT SECONDARY CONTAINMENT FOR ANY VOLUME OF FLUIDS CONTAINED AT THE WATER HANDLING FACILITY SITE DURING NATURAL GAS DEVELOPMENT ACTIVITIES AND OPERATIONS; INCLUDING, BUT NOT LIMITED TO, CONSTRUCTION OF A BERM OR DIVERSION DIKE, DIVERSION/COLLECTION TRENCHES WITHIN AND/OR OUTSIDE OF BERMS/DIKES, SITE GRADING, OR OTHER COMPARABLE MEASURES (I.E., BEST MANAGEMENT PRACTICES (BMPS) ASSOCIATED WITH STORMWATER MANAGEMENT) SUFFICIENTLY PROTECTIVE OF NEARBY SURFACE WATER. ANY BERM CONSTRUCTED AT THE WELL PAD LOCATION WILL BE STABILIZED, INSPECTED AT REGULAR INTERVALS (AT LEAST EVERY 14 DAYS), AND MAINTAINED IN GOOD CONDITION.
EnvironmentalForm: (04)
402046693
05/21/2019
Within 30-days of Sundry Document 402046693, provide a status update for REM 5848.
EnvironmentalForm: (04)
402089903
06/28/2019
Within 6-months of completion of the Water Share, all temporary above ground conveyance lines, pumps, valves, and any other associated equipment and materials shall be removed and areas reclaimed.
EnvironmentalForm: (04)
402780754
09/30/2021
Per Rule 907.g: To ensure compliance with permit conditions and the Commission’s Rules, the facility permit will be subject to an annual review by the Director. To facilitate this review, the Operator will submit an annual report summarizing operations, including the types and volumes of waste handled at the facility. The Director may require additional information.
EnvironmentalForm: (04)
402780754
09/30/2021
Per Rule 909.j: Beginning January 15, 2021, Operators will submit an initial water quality analysis for produced water for each Well from which produced water is placed into a permitted or registered Pit, including Pits that were constructed prior to January 15, 2021. Refer to Rule 909.j. for required analysis as well as information regarding subsequent sampling.
EnvironmentalForm: (04)
402780754
09/30/2021
Per Rule 915.c: Operators will adhere to the concentrations for Groundwater in Table 915-1. The Groundwater standards and analytical methods are derived from the Groundwater standards and classifications established by WQCC Regulation 41 numeric and narrative Groundwater quality standards and classifications, as incorporated by reference in Rule 901.b.
12
 
COGIS - Best Management Practice Results