Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
LOCATION442284Horsetail
07F Pad
FUNDARE RESOURCES OPERATING COMPANY LLC
10773
AC
1/12/2022
WILDCAT
99999
WELD  123
SENW 7 10N57W 6
442284View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A )
400841344
6/11/2015
Operator shall provide notice to COGCC 48 hours prior to commencing construction of this Oil and Gas Location via Form 42. Please note that this notice is now required under Rule 316C.c.
OGLAForm: (02A )
400841344
6/11/2015
Unnecessary or excessive flaring is prohibited. Operator shall direct all salable quality gas to a sales line as soon as practicable or be shut in and conserved per Rule 805.b.(3)B.v.
PermitForm: (04 )
401154041
5/19/2017
Operator shall meet the requirements of the Conductor Notice to Operators dated 10-6-2016 by March 1, 2017: (a) plug conductor and reclaim site, (b) request to keep conductor and provide additional financial assurance, or (c) submit an alternative plan as a variance request.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Storm Water/Erosion ControlForm: (02A )
400841344
6/30/2015
Stormwater management plans (SWMP) are in place to address construction, drilling and operations associated with oil and gas development throughout the State of Colorado. BMPs will be constructed as necessary to prevent stormwater from leaving the construction site. BMPs used will vary according to the location, and will remain until the pad is reclaimed.
Material Handling and Spill PreventionForm: (02A )
400841344
6/30/2015
Spill Prevention Control and Countermeasures (SPCC) plans are in place to address any possible spill associated with oil and gas operations throughout the State of Colorado. • Materials and fluids will be stored in a neat and orderly fashion. • Waste will be collected regularly and disposed of at an offsite facility. • Prompt cleanup is required of spills to minimize waste materials entering the stormwater runoff. • Drip pans will be used during fueling and maintenance to contain spills or leaks. • Cleanup of trash and discarded material will be done at the end of the work day. • Cleanup will consist of monitoring the road, location and any other work areas. • Material to be cleaned up includes trash, scrap, and contaminated soil.