LOCATION441824Anderson
19-1-10HC
PDC ENERGY INC
69175
AC
1/1/2025
WATTENBERG
90750
ADAMS  001
SWSW 18 1S66W 6
441824View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
400746488
05/07/2015
Location lies within the Brighton PWS Buffer Zone. In accordance with Order 1-189, the following COAs have been applied to this permit. Flowback and stimulation fluids shall be contained within tanks that are placed on a well pad or in an area with downgradient perimeter berming; Berms or other containment devices shall be constructed around crude oil, condensate, and produced water storage tanks as follows: a. Secondary containment shall be sized to contain a minimum of 150% of the volume of the largest primary containment vessel within the secondary containment area. b. Containment berms shall be constructed of steel rings, designed and installed to prevent leakage and resist degradation from erosion or routine operation. c. Secondary containment areas for tanks shall be constructed with a synthetic or engineered liner that contains all primary containment vessels and flowlines and is mechanically connected to the steel ring to prevent leakage. d. Tertiary containment, such as an earthen site berm, is required around the downgradient and side-gradient portions of Production Facilities, including process vessels. Production Facilities will be installed with automated fluid level monitoring, capable of alerting the Operator if a sudden change in fluid level or upset condition occurs. Additionally, wells will be equipped with remote shut-in capability. All loadlines shall be bullplugged or capped.
OGLAForm: (02A)
400746488
05/07/2015
Location lies within the Brighton PWS Buffer Zone. In accordance with Order 1-189, the following COAs have been applied to this permit. Pitless drilling systems shall be used
OGLAForm: (02A)
400746488
05/07/2015
Location lies within the Brighton PWS Buffer Zone. In accordance with Order 1-189, the following COAs have been applied to this permit. Notification to the Brighton Public Works Department prior to commencement of new surface disturbing activities at the site; and An emergency spill response program that includes employee training, safety, and maintenance provisions and current contact information for Brighton. The emergency response plan shall specify when notifications to Brighton shall be made and must be prepared in consultation with Brighton. In the event of a spill or release, the Operator shall immediately implement the emergency response procedures in the above-described emergency response program. If a spill or release results in significant adverse impacts or threatens such impacts to a portion of the Brighton PWS, the Operator shall notify Brighton immediately following discovery of the release in addition to reporting in accordance with Rule 906.b.
OGLAForm: (02A)
400746488
05/12/2015
Operator shall provide notice to COGCC 48 hours prior to commencing construction of this Oil and Gas Location via Form 42.
Reclamation SpecialistForm: (04)
401737229
09/25/2018
Approval of this form is an approval of the NTO request only. Future assessments regarding the size and extent of the areas needed for production may be determined on the ground by reclamation staff during a field inspection.
Reclamation SpecialistForm: (04)
401737229
09/25/2018
Financial assurance bond will not be released until the location meets Rule 1003, including vegetation standards.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (02A )
400746488
5/19/2015
Development from existing well pads: In order to reduce surface disturbance, Ward is permitting this 2A for twelve (12) wells.
PlanningForm: (02A )
400746488
5/19/2015
V. Development from existing well pads. In order to reduce surface disturbance, Ward is permitting this 2A for twelve (12) wells.
Community Outreach and NotificationForm: (02A )
400746488
5/19/2015
W. Site-specific measures. Ward will continue to work with the surface owner and address any site-specific measures or concerns the surface owner might have or Ward feels necessary for this location.
Traffic controlForm: (02A )
400746488
5/19/2015
Traffic Plan: A traffic plan will be done if requested by Adams County.
Traffic controlForm: (02A )
400746488
5/19/2015
Ward will construct all leasehold road to accommodate local emergency vehicle access requirements and will be maintained in a reasonable condition.
General HousekeepingForm: (02A )
400746488
5/19/2015
Loadlines: All loadlines shall be bullplugged or capped.
General HousekeepingForm: (02A )
400746488
5/19/2015
Guy Line Anchors: All guy line anchors left buried for future use will be identified by a marker of bright color not less than four feet in height and not greater than one foot east of the guy line anchor.
General HousekeepingForm: (02A )
400746488
5/19/2015
Removal of Surface Trash: Ward agrees that all trash, refuse pipe, equipment, liquids, chemicals of other materials that are not necessary for the continued operations of the wells will be removed and disposed of no later than 30 days after completion. No such items will be burned or buried on location.
General HousekeepingForm: (02A )
400746488
5/19/2015
Well Site Cleared: Ward agrees that all trash, refuse pipe, equipment, liquids, chemicals of other materials that are not necessary for the continued operations of the wells will be removed and disposed of no later than 30 days after completion. No such items will be burned or buried on location.
Material Handling and Spill PreventionForm: (02A )
400746488
5/19/2015
Leak Detection Plan: To ensure protection for the surface during fracturing treatment, the location will be specifically constructed to contain any releases or spills. Secondary containment from any chemical spills or leaks will surround any trucks that carry, mix, or add chemicals to the flow stream as well as connections that could possibly leak fluid. Should any spill or release occur, every reasonable step will be taken to quickly remediate the area disturbed.
Material Handling and Spill PreventionForm: (02A )
400746488
5/19/2015
Control of Fire Hazards: Ward and its contractor’s employ best management practices during the drilling and production of its wells and facilities. They will comply with appropriate COGCC and any county rules concerning fire and safety. Ward will ensure that any flammable material will remain no less than 25 feet from the wellhead (s), tanks and separator(s).
Material Handling and Spill PreventionForm: (02A )
400746488
5/19/2015
Berm Construction: A containment berm will be constructed around the oil and water storage tanks. The berm will be inspected regularly and maintained in good condition.
Material Handling and Spill PreventionForm: (02A )
400746488
5/19/2015
Tank specifications: Tanks shall be constructed and maintained in accordance with the National Fire Protection Association Code 30 (2008 version). All tanks will be visually inspected once a day for issues. Recorded inspections will be conducted once a month pursuant to 40 CFR §112.
Dust controlForm: (02A )
400746488
5/19/2015
Operator will comply with Rule 805.c and take all practicable measures to control fugitive dust caused by the operation, including but not limited to wetting the soil with fresh water via a truck with a spreader bar if deemed necessary.
ConstructionForm: (02A )
400746488
5/19/2015
Fencing: The wellsite will be fenced if requested by the Surface Owner.
ConstructionForm: (02A )
400746488
5/19/2015
Visual Mitigation: Pursuant to Rule 804, the tank battery shall be painted in uniform, non-contrasting, non-reflective color tones with the colors matched to but slightly darker than the surrounding landscape.
Noise mitigationForm: (02A )
400746488
5/19/2015
Noise Mitigation: Noise: An Ambient Sound Study will be conducted on this location. Ward will install temporary sound barriers around the wellpad during drilling and completion.
Drilling/Completion OperationsForm: (02A )
400746488
5/19/2015
Lighting: Site lighting will be directed downward and inward and shielded so as to avoid glare on public roads and Building Units within one thousand (1000) feet.
Drilling/Completion OperationsForm: (02A )
400746488
5/19/2015
BMP added from correspondence with Operator - Ward anticipates commercial quantities of gas and will utilize Green Completions. Ward intends to drill the well in May but complete the well in August when pipeline agreements are in place with Anadarko and Adams County . Anadarko is building a new pipeline that Ward will utilize. Ward will utilize Bronco for their flowback vessels.
Final ReclamationForm: (02A )
400746488
5/19/2015
Identification of Plugged and Abandoned Wells: Pursuant to Rule 319.a.(5)., once the well has been plugged and abandoned, Ward will identify the location of the wellbore with a permanent monument that will detail the well name and date of plugging.
Final ReclamationForm: (02A )
400746488
5/19/2015
U. Identification of plugged and abandoned wells. Ward will identify the location of the wellbore with a permanent monument as specified in Rule 319.a.(5). Ward willl inscribe or imbed the well number and date of plugging upon the permanent monument.