| OGLA | Form: (02A) 400773482 03/24/2015 | Added the statement "We will build out and utilize the Antelope CPF 13-21 Pad to receive the production from the Antelope 14-21 Pad and the State Antelope K-28 Pad. The equipment on the Antelope CPF 13-21 Pad will be installed in an incremental basis as there is additional work in the area that has not been specifically planned or scheduled at this time. The final equipment listing for this location will be reported to the COGCC on a sundry when it is available. The Antelope 14-21 Pad and the State Antelope K-28 Pad will be drilled and completed sequentially allowing for the possibility of equipment adjustment in the process. Due to the fact that the production from these two pads will be routed to the Antelope CPF 31-21 Pad a limited amount of facilities will be installed on the pads. The final equipment listing for these pads will also be reported on a sundry to accurately reflect as-built conditions when a final list can be compiled" to the Submit tab. |