| Construction | Form: (02A ) 400728893 3/4/2015 | The following procedure describes BCEI standard construction practices for setting a partially buried pre-cast cement water vault and new tank battery construction.
1) The excavation will first be lined with 4” of clay or other low permeability soil.
2) A 30 mil liner will be installed on top of the low permeability soil. The 30 mil liner will be a contiguous liner which will underlay the entire tank battery.
3) The tank battery / water vault liner will be keyed into a galvanized steel containment ring installed surrounding the tank battery.
4) Sand bedding will be installed to protect the synthetic liner prior to placing equipment in the containment area.
|
| Construction | Form: (02A ) 400728893 3/4/2015 | Bonanza is working to consolidate its oil and gas facilities for the multiple benefits incurred and our plan is not to build excessive facilities on this location. Upon approval, Bonanza will be constructing a drilling pad which will have production going to the State Pronghorn CPF 41-32 Location ID# 438946. There will be some facility equipment on the Pronghorn D-28 pad, however it is the intention of Bonanza to minimize surface disturbance and excessive construction. |
| Drilling/Completion Operations | Form: (02A ) 400728893 3/4/2015 | BMP-Bonanza Creek Energy acknowledges and will comply with the “COGCC Policy On the Use of Modular Large Volume Tanks in Colorado” dated June 13, 2014.
|
| Construction | Form: (04 ) 401623412 5/24/2018 | Bonanza Creek Energy acknowledges and will comply with the “COGCC Policy On the Use of Modular Large Volume Tanks in Colorado” dated June 13, 2014. |