Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
LOCATION440840State Antelope
J-1 Pad
BONANZA CREEK ENERGY OPERATING COMPANY LLC
8960
AC
1/1/2026
WATTENBERG
90750
WELD  123
SESW 1 5N62W 6
440840View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
400719136
12/05/2014
Operator shall provide notice to COGCC 48 hours prior to commencing construction of this Oil and Gas Location via Form 42.
OGLAForm: (02A)
400719136
01/07/2015
Unnecessary or excessive flaring is prohibited. Operator shall direct all salable quantity gas to a sales line as soon as practicable or shut in and conserved.
OGLAForm: (02A)
400719136
02/06/2015
If, in the event, the listed Production Facilities are removed from this Location, Operator shall submit a Form 4 Sundry updating the changes to the permitted facilities at this Location.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Pre-ConstructionForm: (02A )
400719136
2/10/2015
Operator shall provide notice to COGCC 48 hours prior to commencing construction of this Oil and Gas Location via Form 42.
ConstructionForm: (02A )
400719136
2/10/2015
The following procedure describes BCEI standard construction practices for setting a partially buried pre-cast cement water vault and new tank battery construction. 1) The excavation will first be lined with 4” of clay or other low permeability soil. 2) A 30 mil liner will be installed on top of the low permeability soil. The 30 mil liner will be a contiguous liner which will underlay the entire tank battery. 3) The tank battery / water vault liner will be keyed into a galvanized steel containment ring installed surrounding the tank battery. 4) Sand bedding will be installed to protect the synthetic liner prior to placing equipment in the containment area.
Drilling/Completion OperationsForm: (02A )
400719136
2/10/2015
Bonanza Creek Energy acknowledges and will comply with the “COGCC Policy On the Use of Modular Large Volume Tanks in Colorado” dated June 13, 2014.