TypeSource DocumentConditions of Approval
OGLAForm: (02A)
400720522
12/11/2014
Operator shall provide notice to COGCC 48 hours prior to commencing construction of this Oil and Gas Location via Form 42.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (02A )
400720522
12/23/2014
This proposed oil and gas location is located in a rural rangeland area. The nearest building unit is located 2191’ away.
General HousekeepingForm: (04 )
402833700
1/20/2022
Lights which will be attached to the compressor attenuation building and power distribution center building will be LED, downward facing and the minimum light required by OSHA for egress doors Planning
Noise mitigationForm: (04 )
402833700
1/20/2022
-The injection compressor will be housed within a building to provide additional sound attenuation. -An ambient sound survey was conducted to document noise levels in the area around the site (January 2021). Predicative noise models were created to represent the proposed operations at the EOR Project with injection compressor on location. Noise sensitive receptor locations included in the models were placed in compliance with COGCC noise standards. The numerical and graphical noise modeling results indicate that the proposed operations are predicted to comply with the allowable COGCC daytime and nighttime dBA and dBC limits for the project. -Adding equipment and preparing the location will only occur during daylight hours.
PlanningForm: (04 )
402833700
1/20/2022
Access to the location will be from the existing access road. There will be no new road construction. The road will be properly maintained to accommodate for emergency vehicle access.
General HousekeepingForm: (04 )
402833700
1/20/2022
Fencing Requirements: The equipment on location will be surrounded with a fence and gate with adequate lock to restrict access to authorized personnel only.
General HousekeepingForm: (04 )
402833700
1/20/2022
KMOG`s Integrated Operations Center is staffed 24-hours per day, seven days per week, 365 days per year providing real-time remote monitoring capabilities for all of KMOG`s wells and facilities. Employees in the Integrated Operations Center are able to shut in wells remotely and dispatch personnel to a location within 5-15 minutes.
Dust controlForm: (04 )
402833700
1/20/2022
Water will be placed on unpaved roads to mitigate dust.
Traffic controlForm: (04 )
403231402
2/21/2023
If needed for surfactant injection, fresh water will be piped to location using KMOG's water on demand system.
Material Handling and Spill PreventionForm: (04 )
403231402
2/21/2023
KMOG will install metal berm and impermeable liner around the water storage tanks at a minimum capacity of 150% the volume of a single tank (750 bbl minimum containment).