| Planning | Form: (02A ) 400705762 12/5/2014 | Multi-well Pads. It is a multi-well pad located in a manner which allows for resource
extraction while maintaining the highest distances possible from the offsetting
residential areas.
|
| Traffic control | Form: (02A ) 400705762 12/5/2014 | Access roads. The access road will be constructed to accommodate local emergency
vehicles. This road will be maintained for access at all times
|
| General Housekeeping | Form: (02A ) 400705762 12/5/2014 | Fencing requirements. A permanent fencing plan will be reviewed by the surface
owner, & the applicant. |
| General Housekeeping | Form: (02A ) 400705762 12/5/2014 | Removal of surface trash. All trash, debris and material not intrinsic to the operation of
the oil and gas facility shall be removed and legally disposed of as is applicable |
| Material Handling and Spill Prevention | Form: (02A ) 400705762 12/5/2014 | Load-lines. All load-lines shall be bull-plugged or capped |
| Material Handling and Spill Prevention | Form: (02A ) 400705762 12/5/2014 | 8. Material Handling and Spill Prevention |
| Noise mitigation | Form: (02A ) 400705762 12/5/2014 | Lighting abatement measures shall be implemented, including the installation lighting
shield devices on all of the more conspicuous lights, low density sodium lighting where
practicable; Operator will install temporary engineering controls consisting of perimeter sound walls that shall be used on location during drilling and completion activities. Permanent equipment on location shall be muffled to
reduce noise, or shall be
appropriately buffered.
|
| Odor mitigation | Form: (02A ) 400705762 12/5/2014 | Per Rule 805: Oil & gas facilities and equipment shall be operated in such a manner
that odors and dust do not constitute a nuisance or hazard to public welfare. |
| Drilling/Completion Operations | Form: (02A ) 400705762 12/5/2014 | Closed Loop Drilling Systems – Pit Restrictions. Not applicable; a closed-loop system
will be used for drilling.
|
| Drilling/Completion Operations | Form: (02A ) 400705762 12/5/2014 | Blowout preventer equipment (“BOPE”). A double ram and annular preventer will be
used during drilling. At least the drilling company shall have a valid well blowout
prevention certifications.
|
| Drilling/Completion Operations | Form: (02A ) 400705762 12/5/2014 | BOPE for well servicing operations. Adequate BOP equipment shall be used. Stabbing
valves shall be installed in the event of reverse circulation and shall be prior tested
with low and high pressure fluid.
|
| Drilling/Completion Operations | Form: (02A ) 400705762 12/5/2014 | Pit level indicators. Not applicable; a closed-loop system will be used and no pits shall
be dug
|
| Drilling/Completion Operations | Form: (02A ) 400705762 12/5/2014 | Drill stem tests. Not applicable; no Drill Stem tests are planned
|
| Drilling/Completion Operations | Form: (02A ) 400705762 12/5/2014 | Control of fire hazards. All materials which are considered fire hazards shall be a
minimum of 25’ from the wellhead tanks or separators. Electrical equipment shall
comply with API RP 500 and will comply with the current national electrical code. An
emergency response plan has been generated for this site.
|
| Drilling/Completion Operations | Form: (02A ) 400705762 12/5/2014 | Guy line anchors. All guy line anchors shall be brightly marked pursuant to Rule 604.c
(2)Q |
| Final Reclamation | Form: (02A ) 400705762 12/5/2014 | Well site cleared. Within 90-day subsequent to the time of plugging and abandonment
of the entire site, superfluous debris and equipment shall be removed from the site.
|
| Final Reclamation | Form: (02A ) 400705762 12/5/2014 | Identification of plugged and abandoned wells. P&A’d wells shall be identified pursuant
to 319.a.(5).
|
| Drilling/Completion Operations | Form: (04 ) 401118411 10/3/2016 | The MLVT will be at least 75 feet from a wellhead, fired vessel, heater-treater, or a compressor with a rating of 200 horsepower or more. It will be placed at least 50 feet from a separator, well test unit, or other non-fired equipment. |
| Drilling/Completion Operations | Form: (04 ) 401118411 10/3/2016 | Operator will comply with the testing and re-inspection requirements and associated written standard operating procedures (SOP) listed on the design package. |
| Drilling/Completion Operations | Form: (04 ) 401118411 10/3/2016 | Tanks will be filled using a local water source through temporary waterlines. No water will be trucked to location. |
| Drilling/Completion Operations | Form: (04 ) 401118411 10/3/2016 | Operator has an MLVT Design Package, certified and sealed by a licensed professional engineer, which is on file in their office and available upon request. The site shall be prepared in accordance with the specifications of the design package prior to tank installation; including ensuring that proper compaction requirements have been met. |
| Drilling/Completion Operations | Form: (04 ) 401118411 10/3/2016 | Signs will be posted on the MLVT indicating that the contents are freshwater. |
| Drilling/Completion Operations | Form: (04 ) 401118411 10/3/2016 | The MLVT will be operated with a minimum of 1 foot of freeboard at all times. |
| Drilling/Completion Operations | Form: (04 ) 401118411 10/3/2016 | Operator will be present during initial filling of the MLVT and the contractor will supervise and inspect the MLVT for leaks during filling. |
| Drilling/Completion Operations | Form: (04 ) 401118411 10/3/2016 | Operator or contractor will conduct daily visual inspections of the exterior wall and surrounding area for integrity deficiencies. |