Planning | Form: (02A ) 400702651 11/20/2014 | This will be a single well pad adjacent to a facility for the separation of hydrocarbons and waste, the separated produced water shall be filtered prior to injection. |
Traffic control | Form: (02A ) 400702651 11/20/2014 | Access road: The access road will be constructed to accommodate local emergency
vehicles. This road will be maintained for access at all times.
|
General Housekeeping | Form: (02A ) 400702651 11/20/2014 | Fencing requirements. A permanent fencing plan will be reviewed by the surface owner, & the applicant. |
General Housekeeping | Form: (02A ) 400702651 11/20/2014 | Removal of surface trash. All trash, debris and material not intrinsic to the operation of the oil and gas facility shall be removed and legally disposed of as is applicable. |
Material Handling and Spill Prevention | Form: (02A ) 400702651 11/20/2014 | Leak Detection Plan. Pumper will visit the location daily and visually inspect all tanks and fittings for leaks. Additionally, monthly documented SPCCP inspections are conducted pursuant to 40 CFR §112. |
Material Handling and Spill Prevention | Form: (02A ) 400702651 11/20/2014 | Berm construction. Tank berms shall be constructed of steel rings with a synthetic or engineered liner and designed to contain 150% of the capacity of the largest tank. All berms will be visually checked periodically to ensure proper working condition. |
Material Handling and Spill Prevention | Form: (02A ) 400702651 11/20/2014 | Load-lines. All load-lines shall be bull-plugged or capped. |
Material Handling and Spill Prevention | Form: (02A ) 400702651 11/20/2014 | Tank specifications. Tanks will be designed, constructed and maintained in accordance with NFPA Code 30. The tanks are visually inspected once a day for issues, and recorded inspections are conducted once a month. |
Noise mitigation | Form: (02A ) 400702651 11/20/2014 | Lighting abatement measures shall be implemented, including the installation of lighting shield devices on all of the more conspicuous lights, low density sodium lighting where practicable; and rig shrouding will be used as well as sound walls on the west side during drilling and completion activities to provide noise relief, as the nearest building unit is just over 500' to the west. Permanent equipment on location shall be muffled to reduce noise, or shall be appropriately buffered. |
Odor mitigation | Form: (02A ) 400702651 11/20/2014 | Per Rule 805: Oil & gas facilities and equipment shall be operated in such a manner that odors and dust do not constitute a nuisance or hazard to public welfare. |
Drilling/Completion Operations | Form: (02A ) 400702651 11/20/2014 | Closed Loop Drilling Systems – Pit Restrictions. Not applicable; a closed-loop system will be used for drilling. |
Drilling/Completion Operations | Form: (02A ) 400702651 11/20/2014 | Green Completions – No hydrocarbons will be produced from this well – NA. |
Drilling/Completion Operations | Form: (02A ) 400702651 11/20/2014 | Blowout preventer equipment (“BOPE”). A double ram and annular preventer will be
used during drilling. At least the drilling company shall have a valid well blowout
prevention certifications. Stabbing valves shall be installed in the event of reverse circulation and shall be prior tested with low and high pressure fluid.
|
Drilling/Completion Operations | Form: (02A ) 400702651 11/20/2014 | Drill stem tests. Not applicable; no Drill Stem tests are planned. |
Drilling/Completion Operations | Form: (02A ) 400702651 11/20/2014 | Control of fire hazards. All materials which are considered fire hazards shall be a
minimum of 25’ from the wellhead tanks or separators. Electrical equipment shall
comply with API RP 500 and will comply with the current national electrical code. An
emergency response plan has been generated for this site.
|
Drilling/Completion Operations | Form: (02A ) 400702651 11/20/2014 | Guy line anchors. All guy line anchors shall be brightly marked pursuant to Rule 604.c (2)Q. |
Final Reclamation | Form: (02A ) 400702651 11/20/2014 | Well site cleared. Within 90-day subsequent to the time of plugging and abandonment
of the entire site, superfluous debris and equipment shall be removed from the site.
|
Final Reclamation | Form: (02A ) 400702651 11/20/2014 | P&A’d wells shall be identified pursuant to 319.a.(5). |