LOCATION440017NGL
C5
NGL WATER SOLUTIONS DJ LLC
10373
AC
8/11/2021
WATTENBERG
90750
WELD  123
SWSW 29 2N64W 6
440017View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A )
400702651
11/12/2014
Operator shall provide notice to COGCC 48 hours prior to commencing construction of this Oil and Gas Location via Form 42.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (02A )
400702651
11/20/2014
This will be a single well pad adjacent to a facility for the separation of hydrocarbons and waste, the separated produced water shall be filtered prior to injection.
Traffic controlForm: (02A )
400702651
11/20/2014
Access road: The access road will be constructed to accommodate local emergency vehicles. This road will be maintained for access at all times.
General HousekeepingForm: (02A )
400702651
11/20/2014
Fencing requirements. A permanent fencing plan will be reviewed by the surface owner, & the applicant.
General HousekeepingForm: (02A )
400702651
11/20/2014
Removal of surface trash. All trash, debris and material not intrinsic to the operation of the oil and gas facility shall be removed and legally disposed of as is applicable.
Material Handling and Spill PreventionForm: (02A )
400702651
11/20/2014
Leak Detection Plan. Pumper will visit the location daily and visually inspect all tanks and fittings for leaks. Additionally, monthly documented SPCCP inspections are conducted pursuant to 40 CFR §112.
Material Handling and Spill PreventionForm: (02A )
400702651
11/20/2014
Berm construction. Tank berms shall be constructed of steel rings with a synthetic or engineered liner and designed to contain 150% of the capacity of the largest tank. All berms will be visually checked periodically to ensure proper working condition.
Material Handling and Spill PreventionForm: (02A )
400702651
11/20/2014
Load-lines. All load-lines shall be bull-plugged or capped.
Material Handling and Spill PreventionForm: (02A )
400702651
11/20/2014
Tank specifications. Tanks will be designed, constructed and maintained in accordance with NFPA Code 30. The tanks are visually inspected once a day for issues, and recorded inspections are conducted once a month.
Noise mitigationForm: (02A )
400702651
11/20/2014
Lighting abatement measures shall be implemented, including the installation of lighting shield devices on all of the more conspicuous lights, low density sodium lighting where practicable; and rig shrouding will be used as well as sound walls on the west side during drilling and completion activities to provide noise relief, as the nearest building unit is just over 500' to the west. Permanent equipment on location shall be muffled to reduce noise, or shall be appropriately buffered.
Odor mitigationForm: (02A )
400702651
11/20/2014
Per Rule 805: Oil & gas facilities and equipment shall be operated in such a manner that odors and dust do not constitute a nuisance or hazard to public welfare.
Drilling/Completion OperationsForm: (02A )
400702651
11/20/2014
Closed Loop Drilling Systems – Pit Restrictions. Not applicable; a closed-loop system will be used for drilling.
Drilling/Completion OperationsForm: (02A )
400702651
11/20/2014
Green Completions – No hydrocarbons will be produced from this well – NA.
Drilling/Completion OperationsForm: (02A )
400702651
11/20/2014
Blowout preventer equipment (“BOPE”). A double ram and annular preventer will be used during drilling. At least the drilling company shall have a valid well blowout prevention certifications. Stabbing valves shall be installed in the event of reverse circulation and shall be prior tested with low and high pressure fluid.
Drilling/Completion OperationsForm: (02A )
400702651
11/20/2014
Drill stem tests. Not applicable; no Drill Stem tests are planned.
Drilling/Completion OperationsForm: (02A )
400702651
11/20/2014
Control of fire hazards. All materials which are considered fire hazards shall be a minimum of 25’ from the wellhead tanks or separators. Electrical equipment shall comply with API RP 500 and will comply with the current national electrical code. An emergency response plan has been generated for this site.
Drilling/Completion OperationsForm: (02A )
400702651
11/20/2014
Guy line anchors. All guy line anchors shall be brightly marked pursuant to Rule 604.c (2)Q.
Final ReclamationForm: (02A )
400702651
11/20/2014
Well site cleared. Within 90-day subsequent to the time of plugging and abandonment of the entire site, superfluous debris and equipment shall be removed from the site.
Final ReclamationForm: (02A )
400702651
11/20/2014
P&A’d wells shall be identified pursuant to 319.a.(5).