COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
400697721
10/22/2014
Notify the COGCC 48 hours prior to start of pad construction, rig mobilization, spud, pipeline testing, start of hydraulic stimulation operations, and start of flowback operations (if different that stimulation) using Form 42 (the appropriate COGCC individuals will automatically be email notified, including the LGD for hydraulic stimulation operations). ROAN RIM NTO: Notice to Operators (NTO) Drilling Wells on the Roan Plateau in Garfield County: Operator shall comply with all provisions of the June 12, 2008 Notice to Operators (NTO) Drilling Wells Within ¾ Mile of the Rim of the Roan Plateau in Garfield County – Pit Design, Construction, and Monitoring Requirements. At a minimum, all pits (if constructed) must be lined. The operator shall submit, and receive approval of, a reuse and recycling plan per Rule 907.a.(3), prior to any offsite reuse/recycling of cuttings.
OGLAForm: (02A)
400697721
10/22/2014
Operator must ensure secondary containment for any volume of fluids contained at well site during drilling and completion operations; including, but not limited to, construction of a berm or diversion dike, diversion/collection trenches within and/or outside of berms/dikes, site grading, or other comparable measures (i.e., best management practices (BMPs) associated with stormwater management) sufficiently protective of nearby surface water. Any berm constructed at the well pad location will be stabilized, inspected at regular intervals (at least every 14 days and after precipitation events), and maintained in good condition. The access road will be constructed and maintained as to not allow any sediment to migrate from the access road to nearby surface water or any drainages leading to surface water. Strategically apply fugitive dust control measures, including enforcing established speed limits on private roads, to reduce fugitive dust and coating of vegetation and deposition in water sources. The location is in an area of moderate to high run-on/run-off potential; therefore standard stormwater BMPs must be implemented at this location to insure compliance with CDPHE and COGCC requirements and to prevent any stormwater run-on and /or stormwater run-off. The nearby hillside must be monitored for any day-lighting of drilling fluids throughout the drilling of the surface casing interval. Berms or other containment devices shall be constructed to be sufficiently impervious (corrugated steel with poly liner) to contain any spilled or released material around permanent crude oil, condensate, and produced water storage tanks.
OGLAForm: (02A)
400697721
10/22/2014
The moisture content of drill cuttings managed onsite shall be kept as low as practicable to prevent accumulation of liquids greater than de minimis amounts. After drilling and completion operations have been completed, the drill cuttings that will remain on the well pad location (cuttings management area, the cut portion of the pad, cuttings trench, dry cuttings drilling pit), must meet the applicable standards of Table 910-1. After the drill cuttings have been amended (if necessary) and placed on the well pad, sampling frequency of the drill cuttings (to be determined by the operator) shall be representative of the material left on location. No offsite disposal of cuttings to another oil and gas location shall occur without prior approval of a Waste Management Plan (submitted via a Form 4 Sundry Notice) specifying disposal location and waste characterization method. No offsite reuse of cuttings to another oil and gas location shall occur without prior approval of a Beneficial Reuse or Land Application Plan (submitted via a Form 4 Sundry Notice) specifying reuse or application, location, and waste characterization method. Commercial disposal of drill cuttings will only require notification to COGCC via a Form 4 Sundry Notice. Flowback and stimulation fluids must be sent to tanks, separators, or other containment/filtering equipment before the fluids can be placed into any pipeline, storage vessel, or lined pit (only if an amended Form 2A has been submitted/approved and a Form 15 Earthen Pit Permitted has been submitted/approved) located on the well pad; or into tanker trucks for offsite disposal. The flowback and stimulation fluid tanks, separators, or other containment/filtering equipment must be placed on the well pad in an area with additional downgradient perimeter berming. The area where flowback fluids will be stored/reused must be constructed to be sufficiently impervious to contain any spilled or released material. Potential odors associated with the completions process and/or with long term production operations must be controlled/mitigated.
OGLAForm: (02A)
400697721
10/22/2014
Operator shall pressure test pipelines in accordance with Rule 1101.e.(1) prior to putting into initial service any temporary surface or permanent buried pipelines and following any reconfiguration of the pipeline network. Operator must implement best management practices to contain any unintentional release of fluids along all portions of the surface pipeline route where temporary pumps and other necessary equipment are located. Operator must routinely inspect the entire length of the surface pipeline to ensure integrity. Operator shall conduct daily inspections of surface pipeline routes for leaks during active transfer of fluids. Inspections shall be conducted by viewing the length of the pipeline; operator will endeavor to minimize surface disturbance during pipeline monitoring. The operator shall maintain records of inspections, findings and repairs, if necessary, for the life of the pits. Operator must ensure 110 percent secondary containment for any potential volume of fluids that may be released from the surface pipeline at all sensitive area crossings, including, but not limited to stream, intermittent stream, ditch, and drainage crossings. Operator will utilize, to the extent practical, all existing access and other public roads, and/or existing pipeline right-of-ways, when placing/routing the surface pipelines. This will reduce surface disturbance and fragmentation of wildlife habitat in the area.
OGLAForm: (04)
400774596
01/29/2015
PLANNING: The following conditions of approval (COAs) will apply: Approval of this Form 4 does not authorize operator the right to inject. Authorization to inject into the selected Formation(s) requires approval of both the Form 31 and the Form 33.
OGLAForm: (04)
400774596
01/29/2015
CONSTRUCTION: The following conditions of approval (COAs) will apply: Operator must submit an as-built drawing (plan view and cross-sections) of the injection well pad and associated equipment within 30 calendar days of construction. Operator will use qualified containment devices for all appropriate chemicals/hazardous materials and injection equipment (pumps) used onsite during the operation of the injection well. All tanks and aboveground vessels containing fluids must have secondary containment structures. All secondary containment structures/areas must be lined. Operator must ensure a minimum of 110 percent secondary containment for the largest structure containing fluids within each bermed area at the facility during operations. The construction and lining of the secondary containment structures/areas shall be supervised by a professional engineer or their agent. Operator shall equip and maintain on all tanks an electronic level monitoring device.
OGLAForm: (04)
400774596
01/29/2015
DRILLING/COMPLETIONS: The following conditions of approval (COAs) will apply: Before hydraulic stimulation of the each well, operator shall collect a groundwater sample from the target injection Formation and analyze for total dissolved solids (TDS); submit laboratory analytical results to COGCC (emails: bob.koehler@state.co.us and arthur.koelspell@state.co.us).
EnvironmentalForm: (04)
400875890
07/30/2015
Provide history of spills or releases from the segments of Caerus flowlines that will be used to convey fluids for this transfer.
EnvironmentalForm: (04)
400875890
07/30/2015
Provide the most current flowline integrity results of the Caerus flowlines that will be used to convey fluids for this transfer.
EnvironmentalForm: (04)
400875890
07/30/2015
Provide frequency or schedule for monitoring the Caerus flowlines that will be used to convey fluids for this transfer.
EnvironmentalForm: (04)
400875890
07/30/2015
IF LOCATIONS ARE IN A SENSITIVE AREA BECAUSE OF ITS PROXIMITY TO SURFACE WATER OPERATOR MUST ENSURE 110 PERCENT SECONDARY CONTAINMENT FOR ANY VOLUME OF FLUIDS CONTAINED AT THE WATER HANDLING FACILITY SITE DURING NATURAL GAS DEVELOPMENT ACTIVITIES AND OPERATIONS; INCLUDING, BUT NOT LIMITED TO, CONSTRUCTION OF A BERM OR DIVERSION DIKE, DIVERSION/COLLECTION TRENCHES WITHIN AND/OR OUTSIDE OF BERMS/DIKES, SITE GRADING, OR OTHER COMPARABLE MEASURES (I.E., BEST MANAGEMENT PRACTICES (BMPS) ASSOCIATED WITH STORMWATER MANAGEMENT) SUFFICIENTLY PROTECTIVE OF NEARBY SURFACE WATER. ANY BERM CONSTRUCTED AT THE WELL PAD LOCATION WILL BE STABILIZED, INSPECTED AT REGULAR INTERVALS (AT LEAST EVERY 14 DAYS), AND MAINTAINED IN GOOD CONDITION.
EnvironmentalForm: (04)
400875890
07/30/2015
OPERATOR MUST IMPLEMENT BEST MANAGEMENT PRACTICES TO CONTAIN ANY UNINTENTIONAL RELEASE OF FLUIDS, INCLUDING ANY FLUIDS CONVEYED VIA TEMPORARY SURFACE PIPELINES.
EnvironmentalForm: (04)
400875890
07/30/2015
OPERATOR PROPOSES THAT THIS FACILITY WILL BE IN OPERATION FOR A PERIOD OF 90 DAYS. THIS TRANSFER CAN BE EXTENDED VIA SUNDRY REQUEST, HOWEVER, SHOULD THE OPERATION OF THIS FACILITY CONTINUE MORE THAN ONE YEAR, A FORM 28 SHALL BE SUBMITTED AND APPROVED BEFORE THE ONE-YEAR ANNIVERSARY DATE OF THE FIRST USE OF THE TRANSFER FACIITY/LOCATION.
EnvironmentalForm: (04)
400875890
07/30/2015
BOTH CAERUS AND WPX SHALL NOTIFY THE COGCC VIA SUNDRY IMMEDIATELY UPON TERMINATION OF ACTIVITIES.
EnvironmentalForm: (04)
400875890
07/30/2015
CAERUS AND WPX WILL EACH SEPERATELY SUBMIT AN ANNUAL REPORT TO THE COGCC SUMMARIXZING THE TRANSFER OF PRODUCTION WATER (BOTH AS TRANSFER AND RECEIVING OPERATOR) DURING THE CALENDAR YEAR AND INCUDING LABORATORY ANALYTICAL RESULTS FOR REPRESENTATIVE SAMPLES(S) OF THE PRODUCTION WATER PROVIDED AS THE TRANSFER/RECIEVER. THE ANNUAL REPORT SHALL BE SUBMITTED ON OR BEFORE THE ANNIVERSAY OF THE FIRST DATE OF TRANSFER.
EnvironmentalForm: (04)
400875890
07/30/2015
PROVIDE PRECAUTIONS/SECONDARY CONTAINMENT THAT WILL BE INPLACE FOR BOTH BELOW GRADE AND ABOVE GRADE PIPELINES AS THEY CROSS STREAMS, SENSITVE AREAS, OR ALONG SENSITIVE AREAS.
EnvironmentalForm: (04)
400875890
07/30/2015
PRODUCED WATER OR FLOWBACK WATER OR OTHER EXPLORATION AND PRODUCTION WASTE SHALL NOT BE TEMPORARILY STORED IN MODULAR LARGE VOLUME STORAGE TANKS (MLVSTs). PRODUCED WATER OR FLOWBACK WATER SHALL BE TEMPORAILY STORED IN FRAC TANKS
EnvironmentalForm: (04)
400895930
09/10/2015
IF LOCATIONS ARE IN A SENSITIVE AREA BECAUSE OF ITS PROXIMITY TO SURFACE WATER OPERATOR MUST ENSURE 110 PERCENT SECONDARY CONTAINMENT FOR ANY VOLUME OF FLUIDS CONTAINED AT THE WATER HANDLING FACILITY SITE DURING NATURAL GAS DEVELOPMENT ACTIVITIES AND OPERATIONS; INCLUDING, BUT NOT LIMITED TO, CONSTRUCTION OF A BERM OR DIVERSION DIKE, DIVERSION/COLLECTION TRENCHES WITHIN AND/OR OUTSIDE OF BERMS/DIKES, SITE GRADING, OR OTHER COMPARABLE MEASURES (I.E., BEST MANAGEMENT PRACTICES (BMPS) ASSOCIATED WITH STORMWATER MANAGEMENT) SUFFICIENTLY PROTECTIVE OF NEARBY SURFACE WATER. ANY BERM CONSTRUCTED AT THE WELL PAD LOCATION WILL BE STABILIZED, INSPECTED AT REGULAR INTERVALS (AT LEAST EVERY 14 DAYS), AND MAINTAINED IN GOOD CONDITION.
EnvironmentalForm: (04)
400895930
09/10/2015
OPERATOR MUST IMPLEMENT BEST MANAGEMENT PRACTICES TO CONTAIN ANY UNINTENTIONAL RELEASE OF FLUIDS, INCLUDING ANY FLUIDS CONVEYED VIA TEMPORARY SURFACE PIPELINES.
EnvironmentalForm: (04)
400895930
09/10/2015
OPERATOR PROPOSES THAT THIS FACILITY WILL BE IN OPERATION FOR A PERIOD OF ONE YEAR. EXTENSION OF THIS TRANSFER SHALL BE VIA SUNDRY REQUEST ONLY.
EnvironmentalForm: (04)
400895930
09/10/2015
BOTH CAERUS AND ENCANA SHALL NOTIFY THE COGCC VIA SUNDRY IMMEDIATELY UPON TERMINATION OF ACTIVITIES.
EnvironmentalForm: (04)
400895930
09/10/2015
CAERUS AND ENCANA WILL EACH SEPERATELY SUBMIT AN ANNUAL REPORT TO THE COGCC SUMMARIXZING THE TRANSFER OF PRODUCTION WATER (BOTH AS TRANSFER AND RECEIVING OPERATOR) DURING THE CALENDAR YEAR AND INCUDING LABORATORY ANALYTICAL RESULTS FOR REPRESENTATIVE SAMPLES(S) OF THE PRODUCTION WATER PROVIDED AS THE TRANSFER/RECIEVER. THE ANNUAL REPORT SHALL BE SUBMITTED ON OR BEFORE THE ANNIVERSAY OF THE FIRST DATE OF TRANSFER.
EnvironmentalForm: (04)
400895930
09/10/2015
PROVIDE PRECAUTIONS/SECONDARY CONTAINMENT THAT WILL BE INPLACE FOR BOTH BELOW GRADE AND ABOVE GRADE PIPELINES AS THEY CROSS STREAMS, SENSITVE AREAS, OR ALONG SENSITIVE AREAS.
EnvironmentalForm: (04)
400895930
09/10/2015
PRODUCED WATER OR FLOWBACK WATER OR OTHER EXPLORATION AND PRODUCTION WASTE SHALL NOT BE TEMPORARILY STORED IN MODULAR LARGE VOLUME STORAGE TANKS (MLVSTs). PRODUCED WATER OR FLOWBACK WATER SHALL BE TEMPORAILY STORED IN FRAC TANKS.
EnvironmentalForm: (04)
400895930
09/10/2015
Within 30-days of this Sundry approval provide history of spills or releases from the segments of Encana flowlines that will be used to convey fluids for this transfer.
12
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Pre-ConstructionForm: (02A )
400697721
11/16/2014
• A stabilized staging area will be prepared. • Vehicle tracking pads, geotextiles, or mud mats will be installed where applicable to provide designated access into the ROW. • Perimeter control BMPs will be installed. • Access to areas that are not to be disturbed will be limited to protect the existing vegetation. • Dust mitigation practices will be utilized.
General HousekeepingForm: (02A )
400697721
11/16/2014
• Caerus will routinely inspect the surface pipeline to ensure integrity and conduct daily inspections of surface poly pipeline routes for leaks during active transfer of fluids. Inspections shall be conducted by viewing the length of the pipeline. •Caerus will comply with Rule 609 Statewide Groundwater Baseline Sampling and Monitoring Caerus will comply with Rule 603.f Statewide equipment, weeds, waste, and trash requirements.
WildlifeForm: (02A )
400697721
11/16/2014
• All garbage and any food items will be placed in bear proof trash containers. • Personnel will not feed wildlife at any time. • Bears will not be approached if encountered in the project area. • Seed mix used for interim and final reclamation is prescribed by the landowner. • Other considerations as described in the Wildlife Mitigation Plan with Colorado Division of Parks and Wildlife.
Storm Water/Erosion ControlForm: (02A )
400697721
11/16/2014
• Run-on protection and run-off controls will be installed prior to the beginning of construction activities, as practicable, with consideration given to worker safety and site access. Additional structural and non-structural Best Management Practices (BMPs) will likely need to be installed during and following construction. • No stormwater run-off will be discharged to the Colorado River.
ConstructionForm: (02A )
400697721
11/16/2014
• Stockpiles for topsoil, excess cut material, and drill cuttings will be located in work areas within perimeter BMPs. • Stormwater BMPs will be installed per details in the Stormwater BMP manual. • Disturbed area of site will be left in a surface roughened condition when feasible. • BMPs will be protected, inspected and repaired as necessary. • Dust mitigation practices will be utilized. • The access road will be constructed and maintained as to not allow any sediment to migrate from the access road to nearby surface water or any drainages leading to surface water. • Berms or other containment devices shall be constructed to be sufficiently impervious (corrugated steel with synthetic liner) to contain any spilled or released material around crude oil, condensate, and produced water storage tanks.
Drilling/Completion OperationsForm: (02A )
400697721
11/16/2014
• Topsoil will be stockpiled as appropriate to maintain microbial viability. • Run-off from the facility will be controlled per Stormwater Management Plan. • Pooled water will be treated for mosquitoes to minimize the spread of the West Nile virus. • Caerus will ensure 110 percent secondary containment for any potential volume of fluids that may be released from the surface pipeline at all sensitive area crossings, including, but not limited to stream, intermittent stream, ditch, and drainage crossings.
Interim ReclamationForm: (02A )
400697721
11/16/2014
• Top soil, where present, will be segregated from deeper soils and replaced as top soil on the final grade, a process known as live topsoil handling. • In all cases, temporary disturbance will be kept to an absolute minimum. • Equipment and materials handling will be done on established sites to reduce area and extent of soil compaction. • Disturbances will be reseeded as soon as practical with the recommended mix in the re-vegetation section. • Topsoil stockpiles will be seeded with non-invasive sterile hybrid grasses, if stored longer than one growing season. • Prior to delivery to the site, equipment will be cleaned of soils remaining from previous construction sites which may be contaminated with noxious weeds. • If working in sites with weed-seed contaminated soil, equipment will be cleaned of potentially seed-bearing soils and vegetative debris prior to moving to uncontaminated terrain.
Final ReclamationForm: (02A )
400697721
11/16/2014
• BMPs installed during previous phases will be maintained and repaired as necessary. • Surface will be stabilized with gravel when feasible • BMPs will be inspected. • Seeding and mulching or the installation of erosion control blankets will take place where applicable. • All non-biodegradable temporary BMPs will be removed when applicable. • Dust mitigation practices will be utilized.