| Traffic control | Form: (02A ) 400655044 10/31/2014 | Access roads. The access road will be constructed to accommodate local emergency
vehicles. This road will be maintained for access at all times.
|
| General Housekeeping | Form: (02A ) 400655044 10/31/2014 | Fencing requirements. A permanent fencing plan will be reviewed by the surface owner, & the applicant |
| General Housekeeping | Form: (02A ) 400655044 10/31/2014 | Removal of surface trash. All trash, debris and material not intrinsic to the operation of the oil and gas facility shall be removed and legally disposed of as is applicable. |
| Material Handling and Spill Prevention | Form: (02A ) 400655044 10/31/2014 | Leak Detection Plan. Pumper will visit the location daily and visually inspect all tanks and fittings for leaks. Additionally, monthly documented SPCCP inspections are conducted pursuant to 40 CFR §112.
6. Material Handling and Spill Prevention
|
| Material Handling and Spill Prevention | Form: (02A ) 400655044 10/31/2014 | Berm construction. Tank berms shall be constructed of steel rings with a synthetic or engineered liner and designed to contain 150% of the capacity of the largest tank. All berms will be visually checked periodically to ensure proper working condition. |
| Material Handling and Spill Prevention | Form: (02A ) 400655044 10/31/2014 | Tank specifications. Tanks will be designed, constructed and maintained in accordance with NFPA Code 30. The tanks are visually inspected once a day for issues, and recorded inspections are conducted once a month. |
| Odor mitigation | Form: (02A ) 400655044 10/31/2014 | Per Rule 805: Oil & gas facilities and equipment shall be operated in such a manner that odors and dust do not constitute a nuisance or hazard to public welfare.
|
| Drilling/Completion Operations | Form: (02A ) 400655044 10/31/2014 | Green Completions – Emission Control Systems. Test separators and associated flow lines and sand traps shall be installed on-site to accommodate Green completions techniques pursuant to COGCC Rules. In the anticipated absence of a viable gas sales line, the flow-back gas shall be thermally oxidized in an emissions control device (ECD), which will be installed and kept in operable condition for least the first 90-days of production pursuant to CDPHE rules. This ECD shall have an adequate capacity for
1.5 times the largest flow-back within a 10 mile radius, will be flanged to route gas to other or permanent oxidizing equipment and shall be provided with the equipment needed to maintain combustion where non-combustible gases are present.
|
| Drilling/Completion Operations | Form: (02A ) 400655044 10/31/2014 | Control of fire hazards. All materials which are considered fire hazards shall be a
minimum of 25’ from the wellhead tanks or separators. Electrical equipment shall
comply with API RP 500 and will comply with the current national electrical code. An
emergency response plan has been generated for this site.
|
| Drilling/Completion Operations | Form: (02A ) 400655044 10/31/2014 | Well site cleared. Within 90-day subsequent to the time of plugging and abandonment
of the entire site, superfluous debris and equipment shall be removed from the site.
|