LOCATION439530BURROUGHS NORTH
NENE PAD
1
PRAIRIE OPERATING CO LLC
10819
AC
12/28/2018
WATTENBERG
90750
WELD  123
NENE 14 7N65W 6
439530View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
400654282
09/26/2014
Operator shall provide notice to COGCC 48 hours prior to commencing construction of this Oil and Gas Location via Form 42.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (02A )
400654282
10/30/2014
Multi-well Pads. It is a multi-well pad located in a manner which allows for resource extraction while maintaining the highest distances possible from the offsetting residential areas.
Traffic controlForm: (02A )
400654282
10/30/2014
Access roads. The access road will be constructed to accommodate local emergency vehicles. This road will be maintained for access at all times.
General HousekeepingForm: (02A )
400654282
10/30/2014
Fencing requirements. A permanent fencing plan will be reviewed by the surface owner, & the applicant
General HousekeepingForm: (02A )
400654282
10/30/2014
Removal of surface trash. All trash, debris and material not intrinsic to the operation of the oil and gas facility shall be removed and legally disposed of as is applicable.
Material Handling and Spill PreventionForm: (02A )
400654282
10/30/2014
Load-lines. All load-lines shall be bull-plugged or capped.
Noise mitigationForm: (02A )
400654282
10/30/2014
Lighting abatement measures shall be implemented, including the installation lighting shield devices on all of the more conspicuous lights, low density sodium lighting where practicable; and rig shrouding is not believed necessary, however, at its election the operator may install temporary engineering controls consisting of perimeter sound walls shall be used on the location during drilling and completion activities to provide noise relief. Permanent equipment on location shall be muffled to reduce noise, or shall be appropriately buffered.
Drilling/Completion OperationsForm: (02A )
400654282
10/30/2014
Closed Loop Drilling Systems – Pit Restrictions. Not applicable; a closed-loop system will be used for drilling.
Drilling/Completion OperationsForm: (02A )
400654282
10/30/2014
Blowout preventer equipment (“BOPE”). A double ram and annular preventer will be used during drilling. At least the drilling company shall have a valid well blowout prevention certifications.
Drilling/Completion OperationsForm: (02A )
400654282
10/30/2014
BOPE for well servicing operations. Adequate BOP equipment shall be used. Stabbing valves shall be installed in the event of reverse circulation and shall be prior tested with low and high pressure fluid
Drilling/Completion OperationsForm: (02A )
400654282
10/30/2014
Pit level indicators. Not applicable; a closed-loop system will be used and no pits shall be dug.
Drilling/Completion OperationsForm: (02A )
400654282
10/30/2014
Drill stem tests. Not applicable; no Drill Stem tests are planned.
Drilling/Completion OperationsForm: (02A )
400654282
10/30/2014
Control of fire hazards. All materials which are considered fire hazards shall be a minimum of 25’ from the wellhead tanks or separators. Electrical equipment shall comply with API RP 500 and will comply with the current national electrical code. An emergency response plan has been generated for this site.
Drilling/Completion OperationsForm: (02A )
400654282
10/30/2014
Guy line anchors. All guy line anchors shall be brightly marked pursuant to Rule 604.c (2)Q.
Final ReclamationForm: (02A )
400654282
10/30/2014
Well site cleared. Within 90-day subsequent to the time of plugging and abandonment of the entire site, superfluous debris and equipment shall be removed from the site.
Final ReclamationForm: (02A )
400654282
10/30/2014
Identification of plugged and abandoned wells. P&A’d wells shall be identified pursuant to 319.a.(5).