| Planning | Form: (02A ) 400654282 10/30/2014 | Multi-well Pads. It is a multi-well pad located in a manner which allows for resource
extraction while maintaining the highest distances possible from the offsetting
residential areas.
|
| Traffic control | Form: (02A ) 400654282 10/30/2014 | Access roads. The access road will be constructed to accommodate local emergency
vehicles. This road will be maintained for access at all times.
|
| General Housekeeping | Form: (02A ) 400654282 10/30/2014 | Fencing requirements. A permanent fencing plan will be reviewed by the surface owner, & the applicant
|
| General Housekeeping | Form: (02A ) 400654282 10/30/2014 | Removal of surface trash. All trash, debris and material not intrinsic to the operation of the oil and gas facility shall be removed and legally disposed of as is applicable. |
| Material Handling and Spill Prevention | Form: (02A ) 400654282 10/30/2014 | Load-lines. All load-lines shall be bull-plugged or capped. |
| Noise mitigation | Form: (02A ) 400654282 10/30/2014 | Lighting abatement measures shall be implemented, including the installation lighting shield devices on all of the more conspicuous lights, low density sodium lighting where practicable; and rig shrouding is not believed necessary, however, at its election the operator may install temporary engineering controls consisting of perimeter sound walls shall be used on the location during drilling and completion activities to provide noise relief. Permanent equipment on location shall be muffled to reduce noise, or shall be appropriately buffered.
|
| Drilling/Completion Operations | Form: (02A ) 400654282 10/30/2014 | Closed Loop Drilling Systems – Pit Restrictions. Not applicable; a closed-loop system will be used for drilling. |
| Drilling/Completion Operations | Form: (02A ) 400654282 10/30/2014 | Blowout preventer equipment (“BOPE”). A double ram and annular preventer will be
used during drilling. At least the drilling company shall have a valid well blowout
prevention certifications.
|
| Drilling/Completion Operations | Form: (02A ) 400654282 10/30/2014 | BOPE for well servicing operations. Adequate BOP equipment shall be used. Stabbing
valves shall be installed in the event of reverse circulation and shall be prior tested
with low and high pressure fluid
|
| Drilling/Completion Operations | Form: (02A ) 400654282 10/30/2014 | Pit level indicators. Not applicable; a closed-loop system will be used and no pits shall
be dug.
|
| Drilling/Completion Operations | Form: (02A ) 400654282 10/30/2014 | Drill stem tests. Not applicable; no Drill Stem tests are planned. |
| Drilling/Completion Operations | Form: (02A ) 400654282 10/30/2014 | Control of fire hazards. All materials which are considered fire hazards shall be a
minimum of 25’ from the wellhead tanks or separators. Electrical equipment shall
comply with API RP 500 and will comply with the current national electrical code. An
emergency response plan has been generated for this site.
|
| Drilling/Completion Operations | Form: (02A ) 400654282 10/30/2014 | Guy line anchors. All guy line anchors shall be brightly marked pursuant to Rule 604.c (2)Q. |
| Final Reclamation | Form: (02A ) 400654282 10/30/2014 | Well site cleared. Within 90-day subsequent to the time of plugging and abandonment
of the entire site, superfluous debris and equipment shall be removed from the site.
|
| Final Reclamation | Form: (02A ) 400654282 10/30/2014 | Identification of plugged and abandoned wells. P&A’d wells shall be identified pursuant to 319.a.(5). |