| Planning | Form: (02A ) 400647900 10/4/2014 | Multi-well Pads. It is a multi-well pad located in a manner which allows for resource
extraction while maintaining the highest distances possible from the offsetting
residential areas. |
| Planning | Form: (02A ) 400647900 10/4/2014 | Light sources during all phases of operations will be directed downwards and away
from occupied structures where possible. Once the drilling and completion rigs leave
the site, there will be no permanently installed lighting on site.
Lighting shall be mounted at compressor stations on a pole or building and directed
downward to illuminate key areas within the facility, while minimizing the amount of
light projected outside the facility.
|
| Traffic control | Form: (02A ) 400647900 10/4/2014 | Access roads. The access road will be constructed to accommodate local emergency
vehicles. This road will be maintained for access at all times. |
| General Housekeeping | Form: (02A ) 400647900 10/4/2014 | Fencing requirements. A permanent fencing plan will be reviewed by the surface
owner, & the applicant |
| General Housekeeping | Form: (02A ) 400647900 10/4/2014 | Removal of surface trash. All trash, debris and material not intrinsic to the operation of
the oil and gas facility shall be removed and legally disposed of as is applicable. |
| Material Handling and Spill Prevention | Form: (02A ) 400647900 10/4/2014 | Load-lines. All load-lines shall be bull-plugged or capped. |
| Drilling/Completion Operations | Form: (02A ) 400647900 10/4/2014 | Closed Loop Drilling Systems – Pit Restrictions. Not applicable; a closed-loop system
will be used for drilling. |
| Drilling/Completion Operations | Form: (02A ) 400647900 10/4/2014 | Blowout preventer equipment (“BOPE”). A double ram and annular preventer will be
used during drilling. At least the drilling company shall have a valid well blowout
prevention certifications. |
| Drilling/Completion Operations | Form: (02A ) 400647900 10/4/2014 | BOPE for well servicing operations. Adequate BOP equipment shall be used. Stabbing
valves shall be installed in the event of reverse circulation and shall be prior tested
with low and high pressure fluid
|
| Drilling/Completion Operations | Form: (02A ) 400647900 10/4/2014 | Pit level indicators. Not applicable; a closed-loop system will be used and no pits shall
be dug. |
| Drilling/Completion Operations | Form: (02A ) 400647900 10/4/2014 | Drill stem tests. Not applicable; no Drill Stem tests are planned. |
| Drilling/Completion Operations | Form: (02A ) 400647900 10/4/2014 | Control of fire hazards. All materials which are considered fire hazards shall be a
minimum of 25’ from the wellhead tanks or separators. Electrical equipment shall
comply with API RP 500 and will comply with the current national electrical code. An
emergency response plan has been generated for this site.
|
| Drilling/Completion Operations | Form: (02A ) 400647900 10/4/2014 | Guy line anchors. All guy line anchors shall be brightly marked pursuant to Rule 604.c
(2)Q.
|
| Final Reclamation | Form: (02A ) 400647900 10/4/2014 | Well site cleared. Within 90-day subsequent to the time of plugging and abandonment
of the entire site, superfluous debris and equipment shall be removed from the site. |
| Final Reclamation | Form: (02A ) 400647900 10/4/2014 | Within 90 days subsequent to the time of plugging and abandonment of the entire site,
superfluous debris and equipment shall be removed from the site.
Identification of plugged and abandoned wells will be identified pursuant to 319.a.(5) |