Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
LOCATION439067Ruhl Facility
32H-B264
CRESTONE PEAK RESOURCES OPERATING LLC
10633
AC
10/17/2024
WATTENBERG
90750
WELD  123
NENE 32 2N64W 6
439067View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A )
400651202
9/17/2014
Operator shall provide notice to COGCC 48 hours prior to commencing construction of this Oil and Gas Location via Form 42.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
General HousekeepingForm: (02A )
400651202
9/24/2014
Any material not in use that might constitute a fire hazard will be removed a minimum of twenty-five (25) feet from the wellhead, tanks and separator. Any electrical equipment installations inside the bermed area will comply with API RP 500 classifications and comply with the current national electrical code as adopted by the State of Colorado.
General HousekeepingForm: (02A )
400651202
9/24/2014
The well site will be cleared of all non-essential equipment, trash and debris after ninety days of a well P&A.
Material Handling and Spill PreventionForm: (02A )
400651202
9/24/2014
• Annual hydrostatic test on the oil dump line from the separator to the tank battery. • Annual hydrostatic “static” tests on our oil tanks. • Annual hydrostatic “static” tests on our produced water tank and water dump line from the separator to the produced water tank. • Lease Operator inspections of all equipment not to exceed 48 hours. • Monthly documented inspections (EU). • Annual environmental inspections of all battery and well equipment and pads. • Annual UT inspections of the pressure vessels and input into Encana’s RIPL Predictive Integrity Maintenance Program. (HLP separators and fuel gas separators)"
Material Handling and Spill PreventionForm: (02A )
400651202
9/24/2014
Well effluent containing more than ten (10) barrels per day of condensate or within two (2) hours after first encountering hydrocarbon gas of salable quality will be directed to a combination of sand traps, separators, surge vessels, and tanks as needed to ensure safe separation of sand, hydrocarbon liquids, water, and gas and to ensure salable products are efficiently recovered for sale or conserved and that non-salable products are disposed of in a safe and environmentally responsible manner.
ConstructionForm: (02A )
400651202
9/24/2014
The pad will be constructed in such a manner that noise mitigation may be installed and removed without disturbing the site or landscaping.
ConstructionForm: (02A )
400651202
9/24/2014
Encana utilizes 24” tall corrugated galvanized metal berm walls with a capacity in excess of 150% of the largest tank contained within the wall. In addition, Encana best practices mandates the use of impervious liners that extends under each storage tank and up the walls, permanently affixed to the top of the metal berm wall. Protrusions of piping that come through the liner include a fully sealed “boot” to prevent leakage.
ConstructionForm: (02A )
400651202
9/24/2014
Encana will install fencing to restrict access to wellheads and equipment. (If in a town, "Fencing style will be installed as required by the town".)
ConstructionForm: (02A )
400651202
9/24/2014
At the time of construction, all leasehold roads will be constructed to accommodate local emergency vehicle access requirements, and will be maintained in a reasonable condition.
Noise mitigationForm: (02A )
400651202
9/24/2014
Encana will perform a baseline noise survey prior to any operational activity measuring dBA at a distance 350 feet from the noise source (unless there is an occupied structure closer than that – then measurement will be taken 25 feet from the structure). If low frequency noise is a concern, measurement of dBC will be taken 25 feet from the occupied structure towards the noise source. As necessary, based on the survey, Encana will install temporary sound walls to minimize noise and light impacts during drilling and completions and will install permanent noise mitigation at the facility location as necessary to meet all COGCC regulations.
Noise mitigationForm: (02A )
400651202
9/24/2014
The subject location will be constructed to allow potential future noise mitigation installation without disturbance.
Emissions mitigationForm: (02A )
400651202
9/24/2014
Flow lines, separators, and sand traps capable of supporting green completions as described in Rule 805 will be installed on subject location at which commercial quantities of gas are reasonably expected to be produced based on existing adjacent wells within 1 mile.
Emissions mitigationForm: (02A )
400651202
9/24/2014
Temporary flowback flaring an doxidizing equipment will include: adequeately sized equipment to handle 1.5 times the largest flowback volume of gas experienced in a ten mile radius. If there is overrun, Encana will shut in the well versus freely venting