Planning | Form: (15 ) 400633095 7/30/2014 | The COGCC to be notified 48 hours prior to construction of the Freshwater Storage
Pit. |
Storm Water/Erosion Control | Form: (15 ) 400633095 7/30/2014 | Operator has designed the well pad with insloping and a storm water control ditch to
prevent storm water run-onfun-off and the release of fluids from the location. See
attached Construction Layout Drawing. |
Material Handling and Spill Prevention | Form: (15 ) 400633095 7/30/2014 | Operator will implement best management practices to contain any unintentional
release of fluids. Freshwater for the Freshwater Sotrage Pit comes from water
provider; water sources. Permitted for consumbable industrial use Operator shall not
allow any fluids to flow back to the Freshwater Storage Pit/Pond. Freshwater Storage
Pit shall contain freshwater only and signage prohibiting the use of the pit for any fluid
that does not come from municipal, irrigation or surface water source. |
Drilling/Completion Operations | Form: (15 ) 400633095 7/30/2014 | The location will be fenced and fenced area will include the Freshwater Storage Pit.
Freshwater Storage Pit will be screened off. |