| Planning | Form: (02A ) 400600704 7/6/2014 | The nearest building unit is located 2078’ away from this oil and gas location, therefore it is not within a Designated Setback Location and is exempt from 604.c. |
| Material Handling and Spill Prevention | Form: (02A ) 400600704 7/6/2014 | The tank battery will be constructed using a liner. |