| Storm Water/Erosion Control | Form: (02A ) 400566625 6/18/2014 | Agave will implement a storm water and erosion plan to prevent sedimentation and erosion. |
| Planning | Form: (04 ) 400673814 8/29/2014 | Baseline Water Quality Testing: Agave will comply with COGCC Rule 609 and Elbert County MOU Requirements. |
| Planning | Form: (04 ) 400673814 8/29/2014 | Lighting: All permanent lighting of oil and gas well sites shall be directed downward and internally. |
| Planning | Form: (04 ) 400673814 8/29/2014 | Agave will paint all new production facilities with uniform, non-contrasting, non-reflective color tones and with colors match to, but slightly darker, than surrounding landscapes. |
| Community Outreach and Notification | Form: (04 ) 400673814 8/29/2014 | Agave has submitted an Elbert County Permit. Agave agrees to meet quarterly or as necessary, to monitor and discuss any pertinent issues associated with the location. |
| Traffic control | Form: (04 ) 400673814 8/29/2014 | Private Roads: Agave will construct and maintain an access road designed to accommodate emergency response vehicles. All newly constructed roads will be built to Elbert County Driveway Standards. |
| Traffic control | Form: (04 ) 400673814 8/29/2014 | Water Supply and Quality: To reduce truck traffic, where feasible, temporary surface water lines are encouraged and will be utilized. If necessary, Agave will bury temporary water lines at existing driveway and gravel road crossing, or utilize existing culverts, if available. |
| General Housekeeping | Form: (04 ) 400673814 8/29/2014 | Weed Control and Maintenance: Agave will be responsible for noxious weed control on any disturbed area for the life of the well. |
| Storm Water/Erosion Control | Form: (04 ) 400673814 8/29/2014 | Berms: Agave will inspect berms on a weekly basis for evidence of discharge and within 48 hours of a precipitation event. Inspection and maintenance records will be provided to Elbert County upon request. Agave will implement storm water and erosion control plan to prevent sedimentation and erosion. |
| Material Handling and Spill Prevention | Form: (04 ) 400673814 8/29/2014 | Spill and Release Maintenance: Agave will submit copies of any Form 19 filed with COGCC to the Elbert County LGD. |
| Dust control | Form: (04 ) 400673814 8/29/2014 | Agave will only use fresh water on roads or land surfaces for dust mitigation. |
| Noise mitigation | Form: (04 ) 400673814 8/29/2014 | Agave will provide the Elbert County LDG a 24 hour/7 days a week contact information to respond to all noise complaints arising from the oil and gas location. Agave will post this information on a sign at the entrance to the access road. |