COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
400641110
03/16/2015
The Production Facilities on this Oil and Gas Location shall not be used to treat, store, process or handle production from horizontal well development unless the operator obtains a COGCC Rule 502.b. variance. Neither the Director nor the Commission shall grant such a variance without prior consultation with the City of Fort Lupton.
OGLAForm: (02A)
400641110
03/16/2015
To ensure that this Oil and Gas Location does not interfere with future expansion of County Road 23, no Production Facilities shall be placed west of Production Facilities on the Location at the time of approval of this Form 2A (Document #400641110), as shown on the attached Facility Layout Drawing (Doc #400665063).
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (02A )
400641110
3/27/2015
604.c.(2) Lighting: KPK will not require permanent lighting equipment. If lighting is required temporarily, it will be installed directed downward and inward and shielded so as to avoid glare on public roads and neighbor’s house 252’ away.
General HousekeepingForm: (02A )
400641110
3/27/2015
Housekeeping will consist of neat and orderly storage of materials and fluids. Wastes will be temporarily stored in sealed containers and regularly collected and disposed of at offsite suitable facilities according to WMP. If spills occur prompt cleanup is required to minimize any commingling of waste materials with storm water runoff. Routine maintenance will be limited to fueling and lubrication of equipment. Drip pans will be used during routine fueling and maintenance to contain spills or leaks. Any waste product from maintenance will be containerized and transported offsite for disposal at a certified facility. There will be no major equipment overhauls conducted onsite. Equipment will be transported offsite for major overhauls. Cleanup of trash and discarded materials will be conducted at the end of each workday. Cleanup will consist of patrolling the roadway, access areas, and other work areas to pick up trash, scrap debris, other discarded materials, any contaminated soil, and dust control on location. Materials will be disposed of properly.
General HousekeepingForm: (02A )
400641110
3/27/2015
604.c.(2) P. Trash: KPK will maintain the facility clean of trash, debris, scrap, or discarded material and will dispose of it in a legal manner
Storm Water/Erosion ControlForm: (02A )
400641110
3/27/2015
Storm water Management Plan (SWMP) will be in place to address construction, drilling and operations associated with oil and gas development throughout the state of Colorado in accordance with Colorado Department of Public Health and Environment (CDPHE) General Permit rules. BMP’s used will vary according to location, and will remain in place until the pad reached final reclamation.
Material Handling and Spill PreventionForm: (02A )
400641110
3/27/2015
Spill Prevention Control and countermeasure plan (SPCC) is in place to address construction, drilling and operations associated with oil and gas development throughout the state of Colorado in accordance with CFR 112.
Dust controlForm: (02A )
400641110
3/27/2015
604.c.(2) Dust: In order to minimize fugitive dust, KPK has a reduced speed limitation within the facility and has regular road maintenance scheduled.
ConstructionForm: (02A )
400641110
3/27/2015
Secondary containment will be built with earthen berms and liner for flood control.
ConstructionForm: (02A )
400641110
3/27/2015
604.c.(2) M. Fencing: KPK will install fence around the facility in order to restrict access by unauthorized persons. 604.c.(2) N. : Fire Hazard: KPK will move any material not in use that may constitute a fire hazard a minimum of 25’ from the tanks and separator
Noise mitigationForm: (02A )
400641110
3/27/2015
A noise protection shed will be built around the compressors for noise mitigation within the Exception Zone All equipment and trucks used to construct the well pad will be registered and equipped with noise suppression mufflers Mufflers will be installed on all equipment during drilling and completion operations to minimize engine noise. Production activities that are known to produce higher than normal noise levels, will be carried out during the day in order to minimize disturbance to neighboring houses.
Noise mitigationForm: (02A )
400641110
3/27/2015
604.c.(2) A Noise: KPK will install an engineered sound mitigation around the compressor in order to reduce the noise levels for house located 252’ from the compressor.
Emissions mitigationForm: (02A )
400641110
3/27/2015
A leak detection plan will be filed with the CDPHE based on current regulations and the facility will be inspected during daily pumper visits to minimize any releases.
Odor mitigationForm: (02A )
400641110
3/27/2015
604.c.(2) Odors: KPK will operate the facility in compliance with CDPHE’s Air Quality Control Commission following SOP attached. This facility has emission control units.