Planning | Form: (02A ) 400572719 5/27/2014 | Water Supply and Quality. In an effort to reduce truck traffic, where feasible, the Operator will identify a water source lawfully available for industrial use, including oil and gas development, close to the facility location, to be utilized by Operator and its suppliers. Operator will comply with the Colorado Department of Public Health and Environment requirements concerning water quality. Where feasible, temporary surface water lines are encouraged and will be utilized. Operator may be permitted to utilize County Road Right-of-Way, and County drainage culverts, where practical, for the laying and operation of temporary water lines on the surface. If necessary, operator will bury temporary water lines at existing driveway and gravel road crossings, or utilize existing culverts, if available.
No available water sources within one half mile: If there are no available water sources located within a 1/2 mile radius of a new oil and gas facility, the Operator will test the nearest downgradient available water source that is within a one-mile of the oil and gas facility. |
General Housekeeping | Form: (02A ) 400572719 5/27/2014 | Painting of Oil and Gas Facilities. Except for such facilities that must be painted a certain color for safety reasons, Operator agrees to paint all new (post-MOU) production facilities with uniform, non-contrasting, non-reflective color tones and with colors matched to, but slightly darker, than surrounding landscapes. |
General Housekeeping | Form: (02A ) 400572719 5/27/2014 | Lighting. All permanent lighting of oil and gas well sites shall be directed downward and internally. Temporary lighting shall conform to the Commission’s Rules and Regulations. |
Storm Water/Erosion Control | Form: (02A ) 400572719 5/27/2014 | Berms shall be inspected by Operator on a weekly basis for evidence of discharge. Berms shall be inspected within 48 hours of a precipitation event. |
Material Handling and Spill Prevention | Form: (02A ) 400572719 5/27/2014 | Spill and Release Management. Any spill or release that is reportable to the Commission shall be simultaneously reported to the County. |
Noise mitigation | Form: (02A ) 400572719 5/27/2014 | Noise. Operator shall provide and post 24-hour, 7 days per week contact information to deal with all noise complaints arising from Operator’s oil and gas facilities. |
General Housekeeping | Form: (02A ) 402289820 1/14/2021 | Lighting: All permanent lighting of oil and gas well sites will be directed downward and internally. Temporary lighting shall conform to the Commission's required Rules and Regulations. |
Storm Water/Erosion Control | Form: (02A ) 402289820 1/14/2021 | Operator will install stormwater controls around the Location perimeter consisting of a ditch and berm around the location prior to construction. They will remain in place through final reclamation or until pad is stabilized. Berms will be inspected by Operator on a weekly basis for evidence of discharge.
|
Material Handling and Spill Prevention | Form: (02A ) 402289820 1/14/2021 | Spill and Release Management: Any spill or release that is reportable to the Commission will be simultaneously reported to the County. |