| Form: (02A ) 400541902 4/13/2014 | |
Planning | Form: (02A ) 400541902 4/13/2014 | The Operator agrees to include the contents of Exhibit A of this MOU in all Forms 2 and 2A that it submits to the
Commission and consents to the inclusion of the contents of Exhibit A of this MOU as conditions of the issuance of any permit or other form of approval by the Commission with regard to the location, development or operation of an oil and gas facility in unincorporated portions of the County, unless, and to the extent, waived or modified in writing by the Director of the Arapahoe County Public Works and Development Department, or waived or modified on the record at a public hearing before the Arapahoe County Board of County Commissioners; further, Operator understands and agrees that the provisions of this MOU shall remain conditions of permit or other form of approval regardless of the subsequent sale or other transfer of any oil and gas facilities, or interest therein, by Operator. The County through the LGD process
described in the Commission's Rules may request that the Commission impose site specific conditions as part of the state permit process that are in addition to the Operator's practices or procedures agreed upon herein and the Operator may respond to same as set forth in the Commission's Rules. If the state permit has already been approved and the County and Operator are in agreement as to any subsequent, additional conditions to be placed on the state permit, the
Operator agrees to apply to the Commission to modify the state permit by allowing such subsequent, additional conditions to be placed on the state permit. |
Community Outreach and Notification | Form: (02A ) 400541902 4/13/2014 | Operator shall provide and post 24-hour, 7 days per week contact information to deal with all noise complaints arising from Operator’s oil and gas facilities. |
Community Outreach and Notification | Form: (02A ) 400541902 4/13/2014 | Operator will provide the County with an Emergency Response Plan (ERP) to address all potential emergencies that may be associated with an oil and gas facility. Operator shall also provide a copy of such plan to all emergency service providers that would respond to such emergencies. A “will-serve” letter must be obtained from the appropriate emergency provider(s). |
Storm Water/Erosion Control | Form: (02A ) 400541902 4/13/2014 | See Attached MOU BMPs. |
Material Handling and Spill Prevention | Form: (02A ) 400541902 4/13/2014 | Berms shall be inspected by Operator on a weekly basis for evidence of discharge. Berms shall be inspected within 48 hours of a precipitation event. |
Material Handling and Spill Prevention | Form: (02A ) 400541902 4/13/2014 | Any spill or release that is reportable to the Commission shall be simultaneously reported to the County. |
Noise mitigation | Form: (02A ) 400541902 4/13/2014 | Operator shall provide and post 24-hour, 7 days per week contact information to deal with all noise complaints arising from Operator’s oil and gas facilities. |
Drilling/Completion Operations | Form: (02A ) 400541902 4/13/2014 | All permanent lighting of oil and gas well sites shall be directed downward and internally. Temporary lighting shall conform to the Commission’s Rules and Regulations. |
Interim Reclamation | Form: (02A ) 400541902 4/13/2014 | Operator will be responsible for noxious weed control on any well pad, facility, or disturbed area, from the drilling or installation phase to the closure of the well or facility. |