| Planning | Form: (02A ) 400562234 4/6/2014 | The nearest building unit is located 1,298’ away from this oil and gas location, therefore it is not within a Designated Setback Location and is exempt from 604.c. |
| Construction | Form: (02A ) 400562234 4/6/2014 | 604c.(2).G. Berm Construction: Kerr-McGee will create tertiary containment by construction of a berm or diversion dike, site grading, or other comparable measures sufficient to further protect the wetland located 121' west and 470' northwest of the proposed oil and gas location. |